Productivity is the ability to produce labor in completing the specified number of workers and determines the success of project implementation. Determination of minimum production through worker productivity analysis needs to be considered because it is correlated with the time of completion of wo...
Main Authors: | Waldemar Waldemar, Nia Kartika, Siti Muawanah Robial |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Negeri Jakarta
2022-05-01
|
Series: | Jurnal Pensil |
Subjects: | |
Online Access: | http://journal.unj.ac.id/unj/index.php/jpensil/article/view/25474 |
Similar Items
-
Proposition of a new method for the calculation of diagonal crack widths in reinforced concrete elements subjected to combined torsion and shear
by: Waldemar Budzyński
Published: (2008-06-01) -
Advantage estimator based on importance sampling
by: Quan LIU, et al.
Published: (2019-05-01) -
Advantage estimator based on importance sampling
by: Quan LIU, et al.
Published: (2019-05-01) -
Estimate of dynamic load capacity of reinforced concrete deep beam made of very high strength construction materials
by: Waldemar Cichorski
Published: (2018-12-01) -
Dynamic displacement analysis of reinforced concrete deep beams made of high strength concrete.
Part III: Analysis of dynamic displacement of a reinforced concrete deep beam made of high strength C300 grade concrete
by: Waldemar Cichorski
Published: (2018-09-01)