Summary: | Due to downhole complexities, shale-gas horizontal well fracturing in the Sichuan Basin suffered from casing deformation and failure to apply the technique of cable-conveyed perforation bridge plug. In view of these problems, a new technique of staged volume fracturing with temporary plugging by sand filling is employed. Based on theoretical analyses and field tests, a design of optimized parameters of coiled tubing-conveyed multi-cluster sand-blasting perforation and temporary plugging by sand filling was proposed. It was applied in the horizontal Well ZJ-1 in which casing deformation occurred. The following results are achieved in field operations. First, this technique enables selective staged fracturing in horizontal sections. Second, this technique can realize massive staged fracturing credibly without mechanical plugging, with the operating efficiency equivalent to the conventional bridge plug staged fracturing. Third, full-hole is preserved after fracturing, thus it is possible to directly conduct an open flow test without time consumption of a wiper trip. The staged volume fracturing with temporary plugging by sand filling facilitated the 14-stage fracturing in Well ZJ-1, with similar SRV to that achieved by conventional bridge plug staged fracturing and higher gas yield than neighboring wells on the same well pad. Thus, a new and effective technique is presented in multi-cluster staged volume fracturing of shale gas horizontal wells.
|