Preference of effective Factors in suitable selection of Microtunnel boring machines (mtbm) by using the fuzzy analytic hierarchy process (fahp) approach
The development of underground infrastructure, environmental concerns, and economic trend is influencing society. Due to the increasingly critical nature of installations of utility systems especially in congested areas, the need for monitoring and control system has increased. The microtunneling sy...
Main Authors: | Alireza Jafari, Mohammad Ataie, Sayed Mohammad Esmaiel Jalali, Ahmad Ramazanzadeh |
---|---|
Format: | Article |
Language: | English |
Published: |
Universidad de Costa Rica
2011-07-01
|
Series: | Revista de Matemática: Teoría y Aplicaciones |
Online Access: | https://revistas.ucr.ac.cr/index.php/matematica/article/view/2097 |
Similar Items
-
Microtunnelling : proceedings of the Second International Symposium Microtunneling, Munich, 8th April 1992 /
by: International Symposium Microtunneling (1992 : Munich, Germany)
Published: (1992) -
Microtunnelling and horizontal drilling : recommendations /
by: The French Society for Threnchless Technology
Published: (2006) -
Extended Fuzzy Analytic Hierarchy Process (E-FAHP): A General Approach
by: Javier Reig-Mullor, et al.
Published: (2020-11-01) -
Application of Fuzzy Analytic Hierarchy Process (FAHP) for the Selection of Best Student Award
by: Khairu Azlan Abd Aziz, et al.
Published: (2023-09-01) -
Landslide Hazard Zoning by Fuzzy Analytical Hierarchy Process (FAHP)
by Emphasis on the Slope Shape Factor (Case study: Kamyaran County)
by: Seyed Davod Mohammadi, et al.
Published: (2016-05-01)