Review on the Art of Roof Contacting in Cemented Waste Backfill Technology in a Metal Mine

The backfilling mining method can effectively solve the environmental and safety problems caused by mining. It is the key technology to realize green mining. Scientific development has accelerated the pace of research on the rational utilization of mine solid waste and improved the research level of...

Full description

Bibliographic Details
Main Authors: Fengbin Chen, Jiguang Liu, Xiaowei Zhang, Jinxing Wang, Huazhe Jiao, Jianxin Yu
Format: Article
Language:English
Published: MDPI AG 2022-06-01
Series:Minerals
Subjects:
Online Access:https://www.mdpi.com/2075-163X/12/6/721
Description
Summary:The backfilling mining method can effectively solve the environmental and safety problems caused by mining. It is the key technology to realize green mining. Scientific development has accelerated the pace of research on the rational utilization of mine solid waste and improved the research level of backfilling technology. The development history of the backfilling mining method is introduced in the present paper, and it is determined that roof-contacting backfilling is the key technology of mine-solid-waste backfilling mining. This paper introduces three calculation methods of similar roof-contacted backfilling rates. In this paper, the relationship between the characteristics of backfilling slurry made from solid waste from mines and the roof-contacted backfilling rate is systematically analyzed, such as the flow law in stope (gravity gradient), bleeding shrinkage, and natural sedimentation of backfilling slurry. It is pointed out that the characteristics of the stope, such as washing-pipe water, water for the leading way, filling pipeline, and shape of the backfilling stope, are closely related to the roof-contacted backfilling rate. The influential relationship between objective factors, such as human factors, limited auxiliary leveling measures, and backfilling “one-time operation” in the backfilling process, and high-efficiency top filling are considered, and a schematic diagram of the influencing top-filling rate and structure is drawn. At the same time, this paper summarizes the improvement measures of roof connection from three aspects. These include the use of expansive non-shrinkable materials, forced roof-contacted technology, and strengthening management level. It is pointed out that the roof-contacted filling technology is still facing severe challenges, and the research on the backfilling connection technology needs to be strengthened.