Reliability Analysis of the Main Pier during the Construction Period of HLCR Bridges
In the process of cradle construction for high-pier, long-span, continuous, rigid-frame (HLCR) bridges, the strength failure and instability damage of the main pier will directly affect the bridge construction safety. Therefore, it is necessary to study the reliability of the main pier during the co...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-06-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/12/12/5936 |
_version_ | 1797490315123228672 |
---|---|
author | Ningning Qi Baosheng Xu Tianjing Zhang Qingfu Li |
author_facet | Ningning Qi Baosheng Xu Tianjing Zhang Qingfu Li |
author_sort | Ningning Qi |
collection | DOAJ |
description | In the process of cradle construction for high-pier, long-span, continuous, rigid-frame (HLCR) bridges, the strength failure and instability damage of the main pier will directly affect the bridge construction safety. Therefore, it is necessary to study the reliability of the main pier during the construction of HLCR bridges. This paper starts from the factors that easily affect the stability of the main pier during HLCR bridge cradle construction, establishes the resistance and load probability model of the main pier during the maximum cantilever stage and the maximum unbalanced load of the continuous, rigid-frame bridge’s hanging cradles, fully considers the influence of random factors on the reliability of the pier, and calculates and analyzes the reliability index β through calculation examples. The results show that the changes of various random factors during the construction process have different degrees of influence on the reliability of the bridge pier. Our work provides a basis for the safe control of hanging cradles in the construction of HLCR bridges. |
first_indexed | 2024-03-10T00:31:14Z |
format | Article |
id | doaj.art-1ca96a04a8ce4735878a9b3502afce9e |
institution | Directory Open Access Journal |
issn | 2076-3417 |
language | English |
last_indexed | 2024-03-10T00:31:14Z |
publishDate | 2022-06-01 |
publisher | MDPI AG |
record_format | Article |
series | Applied Sciences |
spelling | doaj.art-1ca96a04a8ce4735878a9b3502afce9e2023-11-23T15:24:55ZengMDPI AGApplied Sciences2076-34172022-06-011212593610.3390/app12125936Reliability Analysis of the Main Pier during the Construction Period of HLCR BridgesNingning Qi0Baosheng Xu1Tianjing Zhang2Qingfu Li3China Construction Seventh Engineering Division Corp. Ltd., Zhengzhou 450004, ChinaChina Construction Seventh Engineering Division Corp. Ltd., Zhengzhou 450004, ChinaSchool of Water Conservancy Engineering, Zhengzhou University, Zhengzhou 450001, ChinaSchool of Water Conservancy Engineering, Zhengzhou University, Zhengzhou 450001, ChinaIn the process of cradle construction for high-pier, long-span, continuous, rigid-frame (HLCR) bridges, the strength failure and instability damage of the main pier will directly affect the bridge construction safety. Therefore, it is necessary to study the reliability of the main pier during the construction of HLCR bridges. This paper starts from the factors that easily affect the stability of the main pier during HLCR bridge cradle construction, establishes the resistance and load probability model of the main pier during the maximum cantilever stage and the maximum unbalanced load of the continuous, rigid-frame bridge’s hanging cradles, fully considers the influence of random factors on the reliability of the pier, and calculates and analyzes the reliability index β through calculation examples. The results show that the changes of various random factors during the construction process have different degrees of influence on the reliability of the bridge pier. Our work provides a basis for the safe control of hanging cradles in the construction of HLCR bridges.https://www.mdpi.com/2076-3417/12/12/5936cradle constructionreliabilitypierprobability modelJC method |
spellingShingle | Ningning Qi Baosheng Xu Tianjing Zhang Qingfu Li Reliability Analysis of the Main Pier during the Construction Period of HLCR Bridges Applied Sciences cradle construction reliability pier probability model JC method |
title | Reliability Analysis of the Main Pier during the Construction Period of HLCR Bridges |
title_full | Reliability Analysis of the Main Pier during the Construction Period of HLCR Bridges |
title_fullStr | Reliability Analysis of the Main Pier during the Construction Period of HLCR Bridges |
title_full_unstemmed | Reliability Analysis of the Main Pier during the Construction Period of HLCR Bridges |
title_short | Reliability Analysis of the Main Pier during the Construction Period of HLCR Bridges |
title_sort | reliability analysis of the main pier during the construction period of hlcr bridges |
topic | cradle construction reliability pier probability model JC method |
url | https://www.mdpi.com/2076-3417/12/12/5936 |
work_keys_str_mv | AT ningningqi reliabilityanalysisofthemainpierduringtheconstructionperiodofhlcrbridges AT baoshengxu reliabilityanalysisofthemainpierduringtheconstructionperiodofhlcrbridges AT tianjingzhang reliabilityanalysisofthemainpierduringtheconstructionperiodofhlcrbridges AT qingfuli reliabilityanalysisofthemainpierduringtheconstructionperiodofhlcrbridges |