Probabilistic analysis of payback period for AC–DC transmission and distribution asset expansion projects
In this study, a new concept of statistical distribution of payback period is calculated for AC–DC transmission and distribution asset expansion projects. For calculation of the payback period, uncertainty is considered with cost and benefit. The Gaussian distribution is considered for correlated in...
Main Authors: | Li Bin, Muhammad Shahzad, Qi Bing, Muhammad U. Shoukat, Nabeel A.M. Fahal, Patrobers Simiyu, Rabiul Islam |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-04-01
|
Series: | The Journal of Engineering |
Subjects: | |
Online Access: | https://digital-library.theiet.org/content/journals/10.1049/joe.2018.8383 |
Similar Items
-
Modeling approximately normal distributions with s-systems /
by: 224279 Rust, Philip F. -
Application and Prospect of Flexible Transmission and Distribution Technology in Internet Data Center
by: Deyang CHEN, et al.
Published: (2023-09-01) -
Study on two‐stage optimal scheduling of DC distribution networks considering flexible load response
by: Lei Chen, et al.
Published: (2024-11-01) -
Feasibility study of double circuit AC transmission line for AC-DC power transmission /
by: Siti Nabilah Md. Sa'at, et al.
Published: (2008) -
Risk‐based optimal operation of coordinated natural gas and reconfigurable electrical networks with integrated energy hubs
by: Mohammad Hemmati, et al.
Published: (2021-09-01)