Constructability in industrial plants construction: a BIM-lean approach using the Digital Obeya Room framework
One of the main problems the construction industry faces is the high cost and slow execution time due to inadequate planning, which results in poor use of human resources. A common solution for reducing time and costs is the adoption of prefabricated components (prefabs). This paper proposes a novel...
Main Authors: | Daniel Luiz de Mattos Nascimento, Elisa Dominguez Sotelino, Thiago Pires Santoloni Lara, Rodrigo Goyannes Gusmão Caiado, Paulo Ivson |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2017-11-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | http://journals.vgtu.lt/index.php/JCEM/article/view/1262 |
Similar Items
-
Facility Management using digital Obeya Room by integrating BIM-Lean approaches – an empirical study
by: Daniel Luiz de Mattos Nascimento, et al.
Published: (2018-12-01) -
BIM and Lean Construction: The Evolution Obstacle in the Brazilian Civil Construction Industry
by: T. W. Alvarenga, et al.
Published: (2017-10-01) -
APPLICATION OF BIM DURING LEAN CONSTRUCTION OF HIGH-RISE BUILDINGS
by: Suchun Yang
Published: (2019-10-01) -
Using BIM as a lean management tool in construction processes – A case study
by: Ahmed.M. Eldeep, et al.
Published: (2022-03-01) -
The role of BIM as a lean tool in design phase
by: Rania Mohsen Aziz, et al.
Published: (2024-01-01)