Single stage concrete pumping through 2.432 km (1.51 miles): Weather and execution challenges
This paper describes the execution challenges faced during single stage pumping of concrete through 2.432 km. Pump and pipeline selection and installation, materials’ development, establishing of control points and controlling variations are discussed. Concrete responses to weather changes play a vi...
Main Authors: | Chetan Hazaree, Viswanath Mahadevan |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2015-12-01
|
Series: | Case Studies in Construction Materials |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2214509515000108 |
Similar Items
-
Performance of dredged sediments based controlled low-strength material
by: Pranshoo Solanki
Published: (2022-09-01) -
A review on ceramic waste-based concrete: A step toward sustainable concrete
by: Ahmad Jawad, et al.
Published: (2023-09-01) -
Quantitative evaluation on the pumpability of lightweight aggregate concrete by a full-scale pumping test
by: Tae Yong Shin, et al.
Published: (2022-06-01) -
Accurate Modeling, Operation Laws and Commutation Timing Matching for Concrete Pumping Systems
by: Haigang Ding, et al.
Published: (2023-07-01) -
Research on Nonconstant and Discontinuous Pumping Characteristics of the Concrete Pump Truck
by: Yafeng Ren, et al.
Published: (2023-05-01)