Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam
In the mining of close coal seam, the stress concentration under the residual coal pillar in the upper coal seam leads to serious deformation to roadway surrounding rock in the lower coal seam. Hence, it poses a huge challenge to the maintenance of entry surrounding rock. Based on this, an approach...
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
SAGE Publishing
2022-09-01
|
Series: | Energy Exploration & Exploitation |
Online Access: | https://doi.org/10.1177/01445987221095116 |
_version_ | 1818490679339253760 |
---|---|
author | Xichun Tian Jiong Wang Guangyuan Yu Haoseng Wang Peng Liu Zhifu Pan Yanjun Wang |
author_facet | Xichun Tian Jiong Wang Guangyuan Yu Haoseng Wang Peng Liu Zhifu Pan Yanjun Wang |
author_sort | Xichun Tian |
collection | DOAJ |
description | In the mining of close coal seam, the stress concentration under the residual coal pillar in the upper coal seam leads to serious deformation to roadway surrounding rock in the lower coal seam. Hence, it poses a huge challenge to the maintenance of entry surrounding rock. Based on this, an approach of entry surrounding rock control technology, directional pre-splitting, and roof-cutting pressure relief, was applied. The stress and deformation of entry surrounding rock utilizing directional pre-splitting and roof-cutting pressure relief were studied by numerical simulation and field test The results indicated that the depth of stress concentration under the residual coal pillar achieve 44 m. With the application of the roof presplitting, the vertical stress of the entry roof decreased. Utilizing the roof presplitting with a height of 7 m and an angle of 15°, the gangue filled the goaf and supported the overlying strata. Meanwhile, the surrounding rock of entry was controlled with a constant resistance anchor cable (9 m length) and gangue prevention support structure. Through field test monitoring, the roof pressure and the deformation of surrounding rock increases rapidly at 30 ∼ 110 m behind the working face. From 110 ∼ 160 m, the increased rate of roof pressure and surrounding rock deformation gradually slows down and tends to be stable at 160 m behind the working face. The maximum displacement of the roof to the floor is 511 mm, and the maximum displacement of the gangue rock wall to coal wall is 421 mm. The remaining roadway meets the demand of the adjacent working face. |
first_indexed | 2024-12-10T17:20:12Z |
format | Article |
id | doaj.art-1d58fad540dd481695a333d862a48737 |
institution | Directory Open Access Journal |
issn | 0144-5987 2048-4054 |
language | English |
last_indexed | 2024-12-10T17:20:12Z |
publishDate | 2022-09-01 |
publisher | SAGE Publishing |
record_format | Article |
series | Energy Exploration & Exploitation |
spelling | doaj.art-1d58fad540dd481695a333d862a487372022-12-22T01:39:59ZengSAGE PublishingEnergy Exploration & Exploitation0144-59872048-40542022-09-014010.1177/01445987221095116Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seamXichun Tian0Jiong Wang1Guangyuan Yu2Haoseng Wang3Peng Liu4Zhifu Pan5Yanjun Wang6 School of Mechanics and Civil Engineering, China University of Mining &Technology, Beijing, 100083, China State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining &Technology (Beijing), 100083, China State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining &Technology (Beijing), 100083, China School of Mechanics and Civil Engineering, China University of Mining &Technology, Beijing, 100083, China School of Mechanics and Civil Engineering, China University of Mining &Technology, Beijing, 100083, China State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining &Technology (Beijing), 100083, China Shanxi Yin Feng S&T CO., LTD, Taiyuan, 030000, ChinaIn the mining of close coal seam, the stress concentration under the residual coal pillar in the upper coal seam leads to serious deformation to roadway surrounding rock in the lower coal seam. Hence, it poses a huge challenge to the maintenance of entry surrounding rock. Based on this, an approach of entry surrounding rock control technology, directional pre-splitting, and roof-cutting pressure relief, was applied. The stress and deformation of entry surrounding rock utilizing directional pre-splitting and roof-cutting pressure relief were studied by numerical simulation and field test The results indicated that the depth of stress concentration under the residual coal pillar achieve 44 m. With the application of the roof presplitting, the vertical stress of the entry roof decreased. Utilizing the roof presplitting with a height of 7 m and an angle of 15°, the gangue filled the goaf and supported the overlying strata. Meanwhile, the surrounding rock of entry was controlled with a constant resistance anchor cable (9 m length) and gangue prevention support structure. Through field test monitoring, the roof pressure and the deformation of surrounding rock increases rapidly at 30 ∼ 110 m behind the working face. From 110 ∼ 160 m, the increased rate of roof pressure and surrounding rock deformation gradually slows down and tends to be stable at 160 m behind the working face. The maximum displacement of the roof to the floor is 511 mm, and the maximum displacement of the gangue rock wall to coal wall is 421 mm. The remaining roadway meets the demand of the adjacent working face.https://doi.org/10.1177/01445987221095116 |
spellingShingle | Xichun Tian Jiong Wang Guangyuan Yu Haoseng Wang Peng Liu Zhifu Pan Yanjun Wang Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam Energy Exploration & Exploitation |
title | Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam |
title_full | Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam |
title_fullStr | Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam |
title_full_unstemmed | Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam |
title_short | Research and application of Gob-Side entry retaining with roof presplitting under residual coal pillar of upper coal seam |
title_sort | research and application of gob side entry retaining with roof presplitting under residual coal pillar of upper coal seam |
url | https://doi.org/10.1177/01445987221095116 |
work_keys_str_mv | AT xichuntian researchandapplicationofgobsideentryretainingwithroofpresplittingunderresidualcoalpillarofuppercoalseam AT jiongwang researchandapplicationofgobsideentryretainingwithroofpresplittingunderresidualcoalpillarofuppercoalseam AT guangyuanyu researchandapplicationofgobsideentryretainingwithroofpresplittingunderresidualcoalpillarofuppercoalseam AT haosengwang researchandapplicationofgobsideentryretainingwithroofpresplittingunderresidualcoalpillarofuppercoalseam AT pengliu researchandapplicationofgobsideentryretainingwithroofpresplittingunderresidualcoalpillarofuppercoalseam AT zhifupan researchandapplicationofgobsideentryretainingwithroofpresplittingunderresidualcoalpillarofuppercoalseam AT yanjunwang researchandapplicationofgobsideentryretainingwithroofpresplittingunderresidualcoalpillarofuppercoalseam |