Evaluation of environmental flow requirement using wetted perimeter method and GIS application for impact assessment
The environmental flow requirement varies from project to project based on their location, need, and habitat. The Binwa hydropower project is in the Kangra district of the Himachal Pradesh and a small hydropower project of 6 MW capacity. Here an attempt is made to assess the environmental flow requi...
Main Authors: | C Prakasam, R Saravanan, Varinder S Kanwar |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2021-02-01
|
Series: | Ecological Indicators |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1470160X20309584 |
Similar Items
-
The use of wetted perimeter as habitat proxy to assess environmental flows in Southern Quebec rivers (Canada)
by: Laureline Berthot, et al.
Published: (2021-12-01) -
Modification of Tennant and Wetted Perimeter Methods in Simindasht Basin, Tehran Province
by: Mehdi Sedighkia, et al.
Published: (2017-12-01) -
Topological and fractal aspects of the main hydraulic parameters
by: Lyapin Anton, et al.
Published: (2018-01-01) -
Topological and fractal aspects of the main hydraulic parameters
by: Lyapin Anton, et al.
Published: (2018-01-01) -
Analyzing the impact of environmental flow indices on protecting the biodiversity of macroinvertebrates
by: Mahdi Sedighkia, et al.
Published: (2024-02-01)