Effective Heuristic Algorithms Solving the Jobshop Scheduling Problem with Release Dates
Manufacturing industry reflects a country’s productivity level and occupies an important share in the national economy of developed countries in the world. Jobshop scheduling (JSS) model originates from modern manufacturing, in which a number of tasks are executed individually on a series of process...
Main Authors: | Tao Ren, Yan Zhang, Shuenn-Ren Cheng, Chin-Chia Wu, Meng Zhang, Bo-yu Chang, Xin-yue Wang, Peng Zhao |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-07-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/8/8/1221 |
Similar Items
-
Computerized Jobshop Layout Planning
by: K. Zoller, et al.
Published: (1972-02-01) -
A Hybrid Genetic Algorithm and Parallel Variable Neighborhood Search for Jobshop Scheduling With an Assembly Stage
by: Parviz Fattahi, et al.
Published: (2019-03-01) -
Adjusting scheduling model with release and due dates in production planning
by: Elisa Chinos, et al.
Published: (2017-01-01) -
Robust Scheduling of Two-Agent Customer Orders with Scenario-Dependent Component Processing Times and Release Dates
by: Chin-Chia Wu, et al.
Published: (2022-05-01) -
Blocking Flowshop Scheduling Model for Optimising Cubic Criterion With Release Dates
by: Tao Ren, et al.
Published: (2018-01-01)