ANALISIS PENGGANTIAN KOMPONEN MESIN TUBE SPLICING DAN MESIN TUBE CURING DENGAN DISTRIBUSI WEIBULL DAN PERHITUNGAN EFISIENSI BIAYA DI PT GAJAH TUNGGAL TBK
Abstract: Industrial problems about spare parts/production equipment replacement is one of the very important issue, because this issue relates to the cost that must be issued , both as a consequence of the replacement appliance, repair or the most fatal is the lost production due to the damage. PT...
Main Author: | Budi Ariyanto |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Mercu Buana
2015-05-01
|
Series: | MIX: Jurnal Ilmiah Manajemen |
Online Access: | http://publikasi.mercubuana.ac.id/index.php/Jurnal_Mix/article/view/135 |
Similar Items
-
Penjadwalan Penggantian Komponen Mesin Press Selang Hidrolik di CV RHODA JAYA
by: Aziza, Nur, et al.
Published: (2019) -
Penentuan Interval Waktu Penggantian Komponen Kritis Pada Mesin Volpack Menggunakan Metode Age Replacement
by: Yanuar Yuda Prawiro
Published: (2017-05-01) -
Asas rekabentuk komponen mesin /
by: 418965 Juvinall, Robert C., et al.
Published: (1993) -
Perhitungan Faktor Teknologi Sebagai Komponen Biaya Dalam Sistem Akuntansi Biaya
by: , Timothy Rey Laheba, et al.
Published: (2013) -
Analisis prospek perusahaan dan penggantian mesin pada PT Iga Abadi Pasuruan
by: , IRMAWAN, Hadi, et al.
Published: (1992)