An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line
A high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such a...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-01-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/17/1/270 |
_version_ | 1797358848345899008 |
---|---|
author | Bing Sun Zheng Zhang Jing Hu Zihan Meng Bibin Huang Nana Li |
author_facet | Bing Sun Zheng Zhang Jing Hu Zihan Meng Bibin Huang Nana Li |
author_sort | Bing Sun |
collection | DOAJ |
description | A high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such as energy storage equipment, is still high. It is necessary to propose a method for determining the capacity of energy storage scientifically. An optimization and planning method of energy storage capacity is proposed. It is characterized by determining the optimal capacity of energy storage by carrying out 8760 hours of time series simulation for a provincial power grid with energy storage. Firstly, the current situation of power supply and demand for provincial power grids is analyzed. The difficulty of realizing a power balance at different time scales is analyzed. Then, the source load balancing solutions at different time scales are proposed. The difficulty of a long-term power balance can be alleviated by flexibly adjusting the power on the tie-line of the provincial power grid. And the difficulty of a short-term power balance can be met through energy storage. In addition, an optimal planning model of an energy storage system is established with the power supply cost as the objective function. The optimal capacity of the energy storage is determined by comparing the objective function of different planning schemes. Finally, a case study is carried out. It is found that flexible adjustment of interprovincial interconnection lines can reduce the maximum demand for electricity from 8.439 billion kWh to 2.299 billion kWh. At the same time, the curtailment ratio of renewable electricity can be decreased from 12.6% to 5.0% by using energy storage. However, the average power supply cost of the system gradually increases from 0.307 CNY/kWh to 0.485 CNY/kWh. It is necessary to fully tap into the various values of energy storage equipment. |
first_indexed | 2024-03-08T15:07:05Z |
format | Article |
id | doaj.art-1e842ec9479747d38b637f85e7c930be |
institution | Directory Open Access Journal |
issn | 1996-1073 |
language | English |
last_indexed | 2024-03-08T15:07:05Z |
publishDate | 2024-01-01 |
publisher | MDPI AG |
record_format | Article |
series | Energies |
spelling | doaj.art-1e842ec9479747d38b637f85e7c930be2024-01-10T14:56:31ZengMDPI AGEnergies1996-10732024-01-0117127010.3390/en17010270An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-LineBing Sun0Zheng Zhang1Jing Hu2Zihan Meng3Bibin Huang4Nana Li5School of Electrical and Information Engineering, Tianjin University, Tianjin 300072, ChinaSchool of Electrical and Information Engineering, Tianjin University, Tianjin 300072, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaA high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such as energy storage equipment, is still high. It is necessary to propose a method for determining the capacity of energy storage scientifically. An optimization and planning method of energy storage capacity is proposed. It is characterized by determining the optimal capacity of energy storage by carrying out 8760 hours of time series simulation for a provincial power grid with energy storage. Firstly, the current situation of power supply and demand for provincial power grids is analyzed. The difficulty of realizing a power balance at different time scales is analyzed. Then, the source load balancing solutions at different time scales are proposed. The difficulty of a long-term power balance can be alleviated by flexibly adjusting the power on the tie-line of the provincial power grid. And the difficulty of a short-term power balance can be met through energy storage. In addition, an optimal planning model of an energy storage system is established with the power supply cost as the objective function. The optimal capacity of the energy storage is determined by comparing the objective function of different planning schemes. Finally, a case study is carried out. It is found that flexible adjustment of interprovincial interconnection lines can reduce the maximum demand for electricity from 8.439 billion kWh to 2.299 billion kWh. At the same time, the curtailment ratio of renewable electricity can be decreased from 12.6% to 5.0% by using energy storage. However, the average power supply cost of the system gradually increases from 0.307 CNY/kWh to 0.485 CNY/kWh. It is necessary to fully tap into the various values of energy storage equipment.https://www.mdpi.com/1996-1073/17/1/270energy storagenew type of power systempower and energy balanceprovincial power systempower supply cost |
spellingShingle | Bing Sun Zheng Zhang Jing Hu Zihan Meng Bibin Huang Nana Li An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line Energies energy storage new type of power system power and energy balance provincial power system power supply cost |
title | An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line |
title_full | An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line |
title_fullStr | An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line |
title_full_unstemmed | An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line |
title_short | An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line |
title_sort | energy storage capacity configuration method for a provincial power system considering flexible adjustment of the tie line |
topic | energy storage new type of power system power and energy balance provincial power system power supply cost |
url | https://www.mdpi.com/1996-1073/17/1/270 |
work_keys_str_mv | AT bingsun anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT zhengzhang anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT jinghu anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT zihanmeng anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT bibinhuang anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT nanali anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT bingsun energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT zhengzhang energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT jinghu energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT zihanmeng energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT bibinhuang energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline AT nanali energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline |