An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line

A high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such a...

Full description

Bibliographic Details
Main Authors: Bing Sun, Zheng Zhang, Jing Hu, Zihan Meng, Bibin Huang, Nana Li
Format: Article
Language:English
Published: MDPI AG 2024-01-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/17/1/270
_version_ 1797358848345899008
author Bing Sun
Zheng Zhang
Jing Hu
Zihan Meng
Bibin Huang
Nana Li
author_facet Bing Sun
Zheng Zhang
Jing Hu
Zihan Meng
Bibin Huang
Nana Li
author_sort Bing Sun
collection DOAJ
description A high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such as energy storage equipment, is still high. It is necessary to propose a method for determining the capacity of energy storage scientifically. An optimization and planning method of energy storage capacity is proposed. It is characterized by determining the optimal capacity of energy storage by carrying out 8760 hours of time series simulation for a provincial power grid with energy storage. Firstly, the current situation of power supply and demand for provincial power grids is analyzed. The difficulty of realizing a power balance at different time scales is analyzed. Then, the source load balancing solutions at different time scales are proposed. The difficulty of a long-term power balance can be alleviated by flexibly adjusting the power on the tie-line of the provincial power grid. And the difficulty of a short-term power balance can be met through energy storage. In addition, an optimal planning model of an energy storage system is established with the power supply cost as the objective function. The optimal capacity of the energy storage is determined by comparing the objective function of different planning schemes. Finally, a case study is carried out. It is found that flexible adjustment of interprovincial interconnection lines can reduce the maximum demand for electricity from 8.439 billion kWh to 2.299 billion kWh. At the same time, the curtailment ratio of renewable electricity can be decreased from 12.6% to 5.0% by using energy storage. However, the average power supply cost of the system gradually increases from 0.307 CNY/kWh to 0.485 CNY/kWh. It is necessary to fully tap into the various values of energy storage equipment.
first_indexed 2024-03-08T15:07:05Z
format Article
id doaj.art-1e842ec9479747d38b637f85e7c930be
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-08T15:07:05Z
publishDate 2024-01-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-1e842ec9479747d38b637f85e7c930be2024-01-10T14:56:31ZengMDPI AGEnergies1996-10732024-01-0117127010.3390/en17010270An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-LineBing Sun0Zheng Zhang1Jing Hu2Zihan Meng3Bibin Huang4Nana Li5School of Electrical and Information Engineering, Tianjin University, Tianjin 300072, ChinaSchool of Electrical and Information Engineering, Tianjin University, Tianjin 300072, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaState Grid Energy Research Institute Co., Ltd., Beijing 102209, ChinaA high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such as energy storage equipment, is still high. It is necessary to propose a method for determining the capacity of energy storage scientifically. An optimization and planning method of energy storage capacity is proposed. It is characterized by determining the optimal capacity of energy storage by carrying out 8760 hours of time series simulation for a provincial power grid with energy storage. Firstly, the current situation of power supply and demand for provincial power grids is analyzed. The difficulty of realizing a power balance at different time scales is analyzed. Then, the source load balancing solutions at different time scales are proposed. The difficulty of a long-term power balance can be alleviated by flexibly adjusting the power on the tie-line of the provincial power grid. And the difficulty of a short-term power balance can be met through energy storage. In addition, an optimal planning model of an energy storage system is established with the power supply cost as the objective function. The optimal capacity of the energy storage is determined by comparing the objective function of different planning schemes. Finally, a case study is carried out. It is found that flexible adjustment of interprovincial interconnection lines can reduce the maximum demand for electricity from 8.439 billion kWh to 2.299 billion kWh. At the same time, the curtailment ratio of renewable electricity can be decreased from 12.6% to 5.0% by using energy storage. However, the average power supply cost of the system gradually increases from 0.307 CNY/kWh to 0.485 CNY/kWh. It is necessary to fully tap into the various values of energy storage equipment.https://www.mdpi.com/1996-1073/17/1/270energy storagenew type of power systempower and energy balanceprovincial power systempower supply cost
spellingShingle Bing Sun
Zheng Zhang
Jing Hu
Zihan Meng
Bibin Huang
Nana Li
An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line
Energies
energy storage
new type of power system
power and energy balance
provincial power system
power supply cost
title An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line
title_full An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line
title_fullStr An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line
title_full_unstemmed An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line
title_short An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line
title_sort energy storage capacity configuration method for a provincial power system considering flexible adjustment of the tie line
topic energy storage
new type of power system
power and energy balance
provincial power system
power supply cost
url https://www.mdpi.com/1996-1073/17/1/270
work_keys_str_mv AT bingsun anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT zhengzhang anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT jinghu anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT zihanmeng anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT bibinhuang anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT nanali anenergystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT bingsun energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT zhengzhang energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT jinghu energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT zihanmeng energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT bibinhuang energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline
AT nanali energystoragecapacityconfigurationmethodforaprovincialpowersystemconsideringflexibleadjustmentofthetieline