A Step Forward for Strengthening Cooperation Between River Basin Management Planning and Flood Risk Prevention and Among Countries - JOINTISA Project
This synthesis review is about description of the JOINTISZA, an ongoing project regarding strengthening cooperation between river basin management planning and flood risk prevention in order to enhance the status of waters of the Tisza river basin, the biggest tributary of the Danube river.
Main Authors: | A. CIUREA, I.S. RÎNDAŞU-BEURAN, B. ION, A. BĂRBIERU, R. D. BOGZIANU |
---|---|
Format: | Article |
Language: | English |
Published: |
Cluj University Press
2018-03-01
|
Series: | Aerul şi Apa: Componente ale Mediului |
Subjects: | |
Online Access: | http://aerapa.conference.ubbcluj.ro/2018/PDF/33_CIUREA_etal_289_305.pdf |
Similar Items
-
Flood Risk Assessment in the Tisa River Basin
by: Ionel Sorin RÎNDAŞU-BEURAN, et al.
Published: (2019-03-01) -
Tisza River Valley: future prospects
by: István Nagy, et al.
Published: (2010-12-01) -
Strategy or disaster. Flood prevention related issues and actions in the Tisza River basin
by: Ferenc Schweitzer
Published: (2009-04-01) -
Basin-analogy for calculating spring flood volumes at insufficiency of meteorological data (Tuba river as a case study)
by: Vladimir P. Galakhov, et al.
Published: (2024-02-01) -
River flow analyses for flood projection in the Kabul River Basin
by: Mohammad Assem Mayar, et al.
Published: (2020-03-01)