Methods of erection of high-rise buildings

The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-p...

Full description

Bibliographic Details
Main Authors: Cherednichenko Nadezhda, Oleinik Pavel
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:E3S Web of Conferences
Online Access:https://doi.org/10.1051/e3sconf/20183303040
_version_ 1819275221155184640
author Cherednichenko Nadezhda
Oleinik Pavel
author_facet Cherednichenko Nadezhda
Oleinik Pavel
author_sort Cherednichenko Nadezhda
collection DOAJ
description The article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.
first_indexed 2024-12-23T23:20:52Z
format Article
id doaj.art-204c982dbf93447f8a00d1cb2a9e0e2b
institution Directory Open Access Journal
issn 2267-1242
language English
last_indexed 2024-12-23T23:20:52Z
publishDate 2018-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj.art-204c982dbf93447f8a00d1cb2a9e0e2b2022-12-21T17:26:20ZengEDP SciencesE3S Web of Conferences2267-12422018-01-01330304010.1051/e3sconf/20183303040e3sconf_hrc2018_03040Methods of erection of high-rise buildingsCherednichenko NadezhdaOleinik PavelThe article contains the factors determining the choice of methods for organizing the construction and production of construction and installation work for the construction of high-rise buildings. There are also indicated specific features of their underground parts, characterized by powerful slab-pile foundations, large volumes of earthworks, reinforced bases and foundations for assembly cranes. The work cycle is considered when using reinforced concrete, steel and combined skeletons of high-rise buildings; the areas of application of flow, separate and complex methods are being disclosed. The main conditions for the erection of high-rise buildings and their components are singled out: the choice of formwork systems, delivery and lifting of concrete mixes, installation of reinforcement, the formation of lifting and transporting and auxiliary equipment. The article prescribes the reserves of reduction in the duration of construction due to the creation of: complex mechanized technologies for the efficient construction of foundations in various soil conditions, including in the heaving, swelling, hindered, subsidence, bulk, water-saturated forms; complex mechanized technologies for the erection of monolithic reinforced concrete structures, taking into account the winter conditions of production and the use of mobile concrete-laying complexes and new generation machines; modular formwork systems, distinguished by their versatility, ease, simplicity in operation suitable for complex high-rise construction; more perfect methodology and the development of a set of progressive organizational and technological solutions that ensure a rational relationship between the processes of production and their maximum overlap in time and space.https://doi.org/10.1051/e3sconf/20183303040
spellingShingle Cherednichenko Nadezhda
Oleinik Pavel
Methods of erection of high-rise buildings
E3S Web of Conferences
title Methods of erection of high-rise buildings
title_full Methods of erection of high-rise buildings
title_fullStr Methods of erection of high-rise buildings
title_full_unstemmed Methods of erection of high-rise buildings
title_short Methods of erection of high-rise buildings
title_sort methods of erection of high rise buildings
url https://doi.org/10.1051/e3sconf/20183303040
work_keys_str_mv AT cherednichenkonadezhda methodsoferectionofhighrisebuildings
AT oleinikpavel methodsoferectionofhighrisebuildings