المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن

Talking about the construction industry, they frequently characterized by risk, where most of the construction projects involved in the property being fraught with risks and uncertainty, and this is due to the complexity of the industry and the length of the project, and the large number of parties...

Full description

Bibliographic Details
Main Authors: Sawsan Rasheed Mohammad, Alaa Mohsin Mahdi
Format: Article
Language:English
Published: University of Baghdad 2023-07-01
Series:Journal of Engineering
Online Access:https://joe.uobaghdad.edu.iq/index.php/main/article/view/2575
_version_ 1797782943524978688
author Sawsan Rasheed Mohammad
Alaa Mohsin Mahdi
author_facet Sawsan Rasheed Mohammad
Alaa Mohsin Mahdi
author_sort Sawsan Rasheed Mohammad
collection DOAJ
description Talking about the construction industry, they frequently characterized by risk, where most of the construction projects involved in the property being fraught with risks and uncertainty, and this is due to the complexity of the industry and the length of the project, and the large number of parties that have a relationship with them. The risks in the projects is a reality that can not be neglected or ignored or canceled, but must be managed properly and so transferred, distributed or transferred, and in any case be required to avoid the impact (if possible) or reduce the losses caused them to a minimum. It is noted that the bulk of the claims between the contracting parties arising from those risks where those claims either extension or compensation or extension and compensation together, causing an increase in the cost and duration of the project construction and thus exposed the project manager and architect of the cost problem of building the project within budget and the prescribed period. Recognizes Parties on those claims to be settled through follow-up and resolution takes time and effort "significant" and which may extend for many years after the end of the contract, as well as no one can predict the final outcome of this settlement, although it was in many cases in additional losses to the party who made those Claims believing they زٍؼٛػ for some of the losses incurred by the former, and therefore called for the need to conduct a study of the risks that lead to get these claims and to analyze them in order to identify risks causing compensation claims, as well as causing claims extension and its impact on construction projects and how departments and actions that can be taken to avoid or minimize those risk (in addition to the use of methods and modern techniques to predict the impact of those risks on the cost of the project, which help control and minimize the impact of those claims in construction projects). Results showed that risks causing compensation claims, as well as causing claims ot the most prominent "were errors in guessing, paras created in addition to changes in designs, has also been reached on a number of actions that would lead to avoid or reduce these risks to as little as possible.
first_indexed 2024-03-13T00:19:04Z
format Article
id doaj.art-204cb6aecd604781860f6fb906861a94
institution Directory Open Access Journal
issn 1726-4073
2520-3339
language English
last_indexed 2024-03-13T00:19:04Z
publishDate 2023-07-01
publisher University of Baghdad
record_format Article
series Journal of Engineering
spelling doaj.art-204cb6aecd604781860f6fb906861a942023-07-11T18:34:00ZengUniversity of BaghdadJournal of Engineering1726-40732520-33392023-07-01201010.31026/j.eng.2014.10.10المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكنSawsan Rasheed MohammadAlaa Mohsin Mahdi Talking about the construction industry, they frequently characterized by risk, where most of the construction projects involved in the property being fraught with risks and uncertainty, and this is due to the complexity of the industry and the length of the project, and the large number of parties that have a relationship with them. The risks in the projects is a reality that can not be neglected or ignored or canceled, but must be managed properly and so transferred, distributed or transferred, and in any case be required to avoid the impact (if possible) or reduce the losses caused them to a minimum. It is noted that the bulk of the claims between the contracting parties arising from those risks where those claims either extension or compensation or extension and compensation together, causing an increase in the cost and duration of the project construction and thus exposed the project manager and architect of the cost problem of building the project within budget and the prescribed period. Recognizes Parties on those claims to be settled through follow-up and resolution takes time and effort "significant" and which may extend for many years after the end of the contract, as well as no one can predict the final outcome of this settlement, although it was in many cases in additional losses to the party who made those Claims believing they زٍؼٛػ for some of the losses incurred by the former, and therefore called for the need to conduct a study of the risks that lead to get these claims and to analyze them in order to identify risks causing compensation claims, as well as causing claims extension and its impact on construction projects and how departments and actions that can be taken to avoid or minimize those risk (in addition to the use of methods and modern techniques to predict the impact of those risks on the cost of the project, which help control and minimize the impact of those claims in construction projects). Results showed that risks causing compensation claims, as well as causing claims ot the most prominent "were errors in guessing, paras created in addition to changes in designs, has also been reached on a number of actions that would lead to avoid or reduce these risks to as little as possible. https://joe.uobaghdad.edu.iq/index.php/main/article/view/2575
spellingShingle Sawsan Rasheed Mohammad
Alaa Mohsin Mahdi
المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن
Journal of Engineering
title المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن
title_full المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن
title_fullStr المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن
title_full_unstemmed المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن
title_short المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن
title_sort المخاطر المسببة للمطالبات والاجراءات التي يمكن اتباعها من اجل تجنبها او تخفيضها الى اقل ما يمكن
url https://joe.uobaghdad.edu.iq/index.php/main/article/view/2575
work_keys_str_mv AT sawsanrasheedmohammad ạlmkẖạṭrạlmsbbẗllmṭạlbạtwạlạjrạʾạtạltyymknạtbạʿhạmnạjltjnbhạạwtkẖfyḍhạạlyạqlmạymkn
AT alaamohsinmahdi ạlmkẖạṭrạlmsbbẗllmṭạlbạtwạlạjrạʾạtạltyymknạtbạʿhạmnạjltjnbhạạwtkẖfyḍhạạlyạqlmạymkn