Development of MURCC code for the efficient multi-unit level 3 probabilistic safety assessment
After the Fukushima Daiichi nuclear power plant (NPP) accident, level 3 probabilistic safety assessment (PSA) has emerged as an important task in order to assess the risk level of the multi-unit NPPs in a single nuclear site. Accurate calculation of the radionuclide concentrations and exposure doses...
Main Authors: | Woo Sik Jung, Hye Rin Lee, Jae-Ryang Kim, Gee Man Lee |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-10-01
|
Series: | Nuclear Engineering and Technology |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1738573319309805 |
Similar Items
-
Holistic Approach to Multi-Unit Site Risk Assessment: Status and Issues
by: Inn Seock Kim, et al.
Published: (2017-03-01) -
A new methodology for modeling explicit seismic common cause failures for seismic multi-unit probabilistic safety assessment
by: Woo Sik Jung, et al.
Published: (2020-10-01) -
A new method to calculate a standard set of finite cloud dose correction factors for the level 3 probabilistic safety assessment of nuclear power plants
by: Gee Man Lee, et al.
Published: (2024-04-01) -
Spray System Assessment in Steel Containment of VVER-1000 Reactor with Using Probabilistic Methods
by: D Masti, et al.
Published: (2018-11-01) -
Offsite Construction Methods—What We Learned from the UK Housing Sector
by: Joseph Kwame Ofori-Kuragu, et al.
Published: (2022-12-01)