Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever Method

In the article "Monolithic Concrete vs Precast Concrete for the Construction of Bridges by the Cantilever Method", there are approached a number of issues that come out in the design and execution of prestressed concrete bridge structures using the cantilever method.

Bibliographic Details
Main Authors: Morlova Dumitru Daniel, Chiotan Corina
Format: Article
Language:English
Published: Sciendo 2015-07-01
Series:Romanian Journal of Transport Infrastructure
Subjects:
Online Access:https://doi.org/10.1515/rjti-2015-0028
_version_ 1819117052529475584
author Morlova Dumitru Daniel
Chiotan Corina
author_facet Morlova Dumitru Daniel
Chiotan Corina
author_sort Morlova Dumitru Daniel
collection DOAJ
description In the article "Monolithic Concrete vs Precast Concrete for the Construction of Bridges by the Cantilever Method", there are approached a number of issues that come out in the design and execution of prestressed concrete bridge structures using the cantilever method.
first_indexed 2024-12-22T05:26:51Z
format Article
id doaj.art-2088c16ad5b4453a9ef1a30e877ac069
institution Directory Open Access Journal
issn 2286-2218
language English
last_indexed 2024-12-22T05:26:51Z
publishDate 2015-07-01
publisher Sciendo
record_format Article
series Romanian Journal of Transport Infrastructure
spelling doaj.art-2088c16ad5b4453a9ef1a30e877ac0692022-12-21T18:37:34ZengSciendoRomanian Journal of Transport Infrastructure2286-22182015-07-0141203210.1515/rjti-2015-0028rjti-2015-0028Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever MethodMorlova Dumitru Daniel0Chiotan Corina1Assistant Eng. UTCB – CFDPLecturer, PhD Eng. UTCB – CFDPIn the article "Monolithic Concrete vs Precast Concrete for the Construction of Bridges by the Cantilever Method", there are approached a number of issues that come out in the design and execution of prestressed concrete bridge structures using the cantilever method.https://doi.org/10.1515/rjti-2015-0028betonpodmonolitprefabricatconsolăconcretebridgemonolithprefabricatedcantilever
spellingShingle Morlova Dumitru Daniel
Chiotan Corina
Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever Method
Romanian Journal of Transport Infrastructure
beton
pod
monolit
prefabricat
consolă
concrete
bridge
monolith
prefabricated
cantilever
title Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever Method
title_full Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever Method
title_fullStr Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever Method
title_full_unstemmed Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever Method
title_short Monolithic Concrete vs Precast Concrete for the Construction of Bridge by Th Cantilever Method
title_sort monolithic concrete vs precast concrete for the construction of bridge by th cantilever method
topic beton
pod
monolit
prefabricat
consolă
concrete
bridge
monolith
prefabricated
cantilever
url https://doi.org/10.1515/rjti-2015-0028
work_keys_str_mv AT morlovadumitrudaniel monolithicconcretevsprecastconcretefortheconstructionofbridgebythcantilevermethod
AT chiotancorina monolithicconcretevsprecastconcretefortheconstructionofbridgebythcantilevermethod