A prediction of Power Duration Curve from the Optimal Operation of the Multi Reservoirs System
<p> This study aims of predication Power Duration Curves(PDC) resulting from the optimal operation of the multi reservoirs system which comprises the reservoirs of Bakhma dam,Dokan dam and Makhool dam for the division of years over 30 years.Discrete Differential Dynamic Programming(DDDP) has b...
Main Authors: | Abdul Wahab Younis, Odae Yousif Thanon |
---|---|
Format: | Article |
Language: | English |
Published: |
Tikrit University
2013-04-01
|
Series: | Tikrit Journal of Engineering Sciences |
Subjects: | |
Online Access: | http://www.tj-es.com/ojs/index.php/tjes/article/view/86 |
Similar Items
-
A Prediction of Power Duration Curve from the Optimal Operation of the Multi Reservoirs System
by: Abdul Wahab Younis, et al.
Published: (2011-03-01) -
Study on the Basic Form of Reservoir Operation Rule Curves for Water Supply and Power Generation
by: Rong Tang, et al.
Published: (2024-01-01) -
Improved multi-reservoir operation rules of water supply system based on target storage curves
by: Hongbin Fang, et al.
Published: (2022-06-01) -
Dynamic reservoir rule curves – Their creation and utilization
by: Nesa Ilich
Published: (2024-01-01) -
Multi-objective future rule curves using conditional tabu search algorithm and conditional genetic algorithm for reservoir operation
by: Teerawat Thongwan, et al.
Published: (2019-09-01)