Minimizing the Duration of Repetitive Construction Processes with Work Continuity Constraints
This study adopts the flow shop concept used in industrial production to schedule repetitive non-linear construction projects, where specialized groups of workers execute processes in work zones (buildings) in a predefined order common to all groups. This problem is characteristic of construction pr...
Main Authors: | Piotr Jaśkowski, Sławomir Biruk |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-03-01
|
Series: | Computation |
Subjects: | |
Online Access: | http://www.mdpi.com/2079-3197/7/1/14 |
Similar Items
-
Simulation modelling construction project with repetitive tasks using Petri nets theory
by: Sławomir Biruk, et al.
Published: (2008-09-01) -
Repetitive construction processes scheduling using mixed-integer linear programming
by: Piotr Jaśkowski
Published: (2015-06-01) -
Proactive scheduling of repetitive construction processes to reduce crews idle times and delays
by: Piotr Jaśkowski, et al.
Published: (2021-12-01) -
Selection of the Optimal Actions for Crashing Processes Duration to Increase the Robustness of Construction Schedules
by: Sławomir Biruk, et al.
Published: (2020-11-01) -
Proactive-reactive repetitive project scheduling method – the concept of risk consideration at the project planning and execution stage
by: Piotr Jaskowski, et al.
Published: (2023-12-01)