Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)
The concept of this research is, assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co. In order to satisfy the main goal of this research, “assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI...
Main Authors: | , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Allameh Tabataba'i University Press
2006-06-01
|
Series: | Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī |
Subjects: | |
Online Access: | https://jims.atu.ac.ir/article_4402_2a3fb38809160232ede7b063079f86bb.pdf |
_version_ | 1797368924667379712 |
---|---|
author | Akbar Alam Tabriz Maryam Bahrami |
author_facet | Akbar Alam Tabriz Maryam Bahrami |
author_sort | Akbar Alam Tabriz |
collection | DOAJ |
description | The concept of this research is, assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co.
In order to satisfy the main goal of this research, “assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co” assessment conducted in four areas.
1. The senior management committed to the implementation and execution of TPM.
2. The employee participation regarding the implementation and execution of TPM.
3. The usage level of statistical process control tools.
4. The usage level of maintenance procedures.
The statistical target group is SHASI SAZ IRAN Company’s managers, experts and production line supervisors.
This research based on the method of data collection, is of the descriptive kind.
Collection of data was based on library findings and field studies. In order to analyze the data, the comparison of target group average with assumed average test was employed.
After analysis, the readiness information of the SHASI SAZ IRAN Company based on the four questions of the research and as a result, the main question, were all placed below average. Overall, considering the individual answers, employee participation achieved first place in terms of readiness and following were maintenance procedures, management commitment and SPC tools. |
first_indexed | 2024-03-08T17:39:37Z |
format | Article |
id | doaj.art-2200c4072f284bb49715553c3e871165 |
institution | Directory Open Access Journal |
issn | 2251-8029 2476-602X |
language | fas |
last_indexed | 2024-03-08T17:39:37Z |
publishDate | 2006-06-01 |
publisher | Allameh Tabataba'i University Press |
record_format | Article |
series | Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī |
spelling | doaj.art-2200c4072f284bb49715553c3e8711652024-01-02T11:14:06ZfasAllameh Tabataba'i University PressMuṭāli̒āt-i Mudīriyyat-i Ṣan̒atī2251-80292476-602X2006-06-014131184402Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)Akbar Alam Tabriz0Maryam Bahrami1دانشیار گروه مدیریت صنعتی دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی تهرانکارشناسی ارشد مدیریت صنعتی دانشگاه شهید بهشتی تهرانThe concept of this research is, assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co. In order to satisfy the main goal of this research, “assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co” assessment conducted in four areas. 1. The senior management committed to the implementation and execution of TPM. 2. The employee participation regarding the implementation and execution of TPM. 3. The usage level of statistical process control tools. 4. The usage level of maintenance procedures. The statistical target group is SHASI SAZ IRAN Company’s managers, experts and production line supervisors. This research based on the method of data collection, is of the descriptive kind. Collection of data was based on library findings and field studies. In order to analyze the data, the comparison of target group average with assumed average test was employed. After analysis, the readiness information of the SHASI SAZ IRAN Company based on the four questions of the research and as a result, the main question, were all placed below average. Overall, considering the individual answers, employee participation achieved first place in terms of readiness and following were maintenance procedures, management commitment and SPC tools.https://jims.atu.ac.ir/article_4402_2a3fb38809160232ede7b063079f86bb.pdfassessingtotal productive maintenance (tpm)readinessimplementation |
spellingShingle | Akbar Alam Tabriz Maryam Bahrami Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.) Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī assessing total productive maintenance (tpm) readiness implementation |
title | Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.) |
title_full | Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.) |
title_fullStr | Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.) |
title_full_unstemmed | Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.) |
title_short | Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.) |
title_sort | assessing the degree of readiness for the implementation of tpm case study conducted at shasi saz iran co |
topic | assessing total productive maintenance (tpm) readiness implementation |
url | https://jims.atu.ac.ir/article_4402_2a3fb38809160232ede7b063079f86bb.pdf |
work_keys_str_mv | AT akbaralamtabriz assessingthedegreeofreadinessfortheimplementationoftpmcasestudyconductedatshasisaziranco AT maryambahrami assessingthedegreeofreadinessfortheimplementationoftpmcasestudyconductedatshasisaziranco |