Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)

The concept of this research is, assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co. In order to satisfy the main goal of this research, “assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI...

Full description

Bibliographic Details
Main Authors: Akbar Alam Tabriz, Maryam Bahrami
Format: Article
Language:fas
Published: Allameh Tabataba'i University Press 2006-06-01
Series:Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī
Subjects:
Online Access:https://jims.atu.ac.ir/article_4402_2a3fb38809160232ede7b063079f86bb.pdf
_version_ 1797368924667379712
author Akbar Alam Tabriz
Maryam Bahrami
author_facet Akbar Alam Tabriz
Maryam Bahrami
author_sort Akbar Alam Tabriz
collection DOAJ
description The concept of this research is, assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co. In order to satisfy the main goal of this research, “assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co” assessment conducted in four areas. 1.  The senior management committed to the implementation and execution of TPM. 2.   The employee participation regarding the implementation and execution of TPM. 3. The usage level of statistical process control tools. 4.         The usage level of maintenance procedures. The statistical target group is SHASI SAZ IRAN Company’s managers, experts and production line supervisors. This research based on the method of data collection, is of the descriptive kind. Collection of data was based on library findings and field studies. In order to analyze the data, the comparison of target group average with assumed average test was employed. After analysis, the readiness information of the SHASI SAZ IRAN Company based on the four questions of the research and as a result, the main question, were all placed below average. Overall, considering the individual answers, employee participation achieved first place in terms of readiness and following were maintenance procedures, management commitment and SPC tools.
first_indexed 2024-03-08T17:39:37Z
format Article
id doaj.art-2200c4072f284bb49715553c3e871165
institution Directory Open Access Journal
issn 2251-8029
2476-602X
language fas
last_indexed 2024-03-08T17:39:37Z
publishDate 2006-06-01
publisher Allameh Tabataba'i University Press
record_format Article
series Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī
spelling doaj.art-2200c4072f284bb49715553c3e8711652024-01-02T11:14:06ZfasAllameh Tabataba'i University PressMuṭāli̒āt-i Mudīriyyat-i Ṣan̒atī2251-80292476-602X2006-06-014131184402Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)Akbar Alam Tabriz0Maryam Bahrami1دانشیار گروه مدیریت صنعتی دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی تهرانکارشناسی ارشد مدیریت صنعتی دانشگاه شهید بهشتی تهرانThe concept of this research is, assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co. In order to satisfy the main goal of this research, “assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co” assessment conducted in four areas. 1.  The senior management committed to the implementation and execution of TPM. 2.   The employee participation regarding the implementation and execution of TPM. 3. The usage level of statistical process control tools. 4.         The usage level of maintenance procedures. The statistical target group is SHASI SAZ IRAN Company’s managers, experts and production line supervisors. This research based on the method of data collection, is of the descriptive kind. Collection of data was based on library findings and field studies. In order to analyze the data, the comparison of target group average with assumed average test was employed. After analysis, the readiness information of the SHASI SAZ IRAN Company based on the four questions of the research and as a result, the main question, were all placed below average. Overall, considering the individual answers, employee participation achieved first place in terms of readiness and following were maintenance procedures, management commitment and SPC tools.https://jims.atu.ac.ir/article_4402_2a3fb38809160232ede7b063079f86bb.pdfassessingtotal productive maintenance (tpm)readinessimplementation
spellingShingle Akbar Alam Tabriz
Maryam Bahrami
Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)
Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī
assessing
total productive maintenance (tpm)
readiness
implementation
title Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)
title_full Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)
title_fullStr Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)
title_full_unstemmed Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)
title_short Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)
title_sort assessing the degree of readiness for the implementation of tpm case study conducted at shasi saz iran co
topic assessing
total productive maintenance (tpm)
readiness
implementation
url https://jims.atu.ac.ir/article_4402_2a3fb38809160232ede7b063079f86bb.pdf
work_keys_str_mv AT akbaralamtabriz assessingthedegreeofreadinessfortheimplementationoftpmcasestudyconductedatshasisaziranco
AT maryambahrami assessingthedegreeofreadinessfortheimplementationoftpmcasestudyconductedatshasisaziranco