Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital

Transformers are installed in power distribution systems to perform changes in supply voltage. Large consumers often have several transformers installed in parallel to ensure continuity of supply in the event of failure. These machines can achieve very high efficiency, but their efficiency is not co...

Full description

Bibliographic Details
Main Authors: Carlos Javier Renedo, Agustín Santisteban, Félix Ortiz, Cristian Olmo, Alfredo Ortiz
Format: Article
Language:English
Published: MDPI AG 2018-02-01
Series:Energies
Subjects:
Online Access:http://www.mdpi.com/1996-1073/11/2/419
_version_ 1798038684947185664
author Carlos Javier Renedo
Agustín Santisteban
Félix Ortiz
Cristian Olmo
Alfredo Ortiz
author_facet Carlos Javier Renedo
Agustín Santisteban
Félix Ortiz
Cristian Olmo
Alfredo Ortiz
author_sort Carlos Javier Renedo
collection DOAJ
description Transformers are installed in power distribution systems to perform changes in supply voltage. Large consumers often have several transformers installed in parallel to ensure continuity of supply in the event of failure. These machines can achieve very high efficiency, but their efficiency is not constant since it depends on the power demanded at each time. Therefore, the level of efficiency that correspond to the operation of a specific transformer depends on two factors: machine technical characteristics and electrical load. In this work, the authors have proposed a methodology which shows the optimal number of transformers to be connected at each period in the substations of a large Spanish hospital, in order to achieve the maximum seasonal efficiency of these machines. The results of the energy saving are determined with respect to the current situation, in which all the transformers are permanently connected. On the other hand, the European Union has established a new regulation that sets the minimum energy efficiency requirements for new power transformers. This efficiency improvement is proposed to be applied gradually in two stages, a first limit came into force in 2015, while a more restrictive approach will appear in the year 2021. This work has also studied the potential energy savings that would occur when the substations of the hospital have more efficient transformers complying with the new European Regulation 548/2014.
first_indexed 2024-04-11T21:44:40Z
format Article
id doaj.art-22675d6f8dfe44b8a27ca66f7bc0f9a2
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-04-11T21:44:40Z
publishDate 2018-02-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-22675d6f8dfe44b8a27ca66f7bc0f9a22022-12-22T04:01:28ZengMDPI AGEnergies1996-10732018-02-0111241910.3390/en11020419en11020419Evaluation of the Optimal Connection of Power Transformers in the Substations of a HospitalCarlos Javier Renedo0Agustín Santisteban1Félix Ortiz2Cristian Olmo3Alfredo Ortiz4Electrical and Energy Engineering Department, University of Cantabria, 39005 Santander, SpainElectrical and Energy Engineering Department, University of Cantabria, 39005 Santander, SpainElectrical and Energy Engineering Department, University of Cantabria, 39005 Santander, SpainElectrical and Energy Engineering Department, University of Cantabria, 39005 Santander, SpainElectrical and Energy Engineering Department, University of Cantabria, 39005 Santander, SpainTransformers are installed in power distribution systems to perform changes in supply voltage. Large consumers often have several transformers installed in parallel to ensure continuity of supply in the event of failure. These machines can achieve very high efficiency, but their efficiency is not constant since it depends on the power demanded at each time. Therefore, the level of efficiency that correspond to the operation of a specific transformer depends on two factors: machine technical characteristics and electrical load. In this work, the authors have proposed a methodology which shows the optimal number of transformers to be connected at each period in the substations of a large Spanish hospital, in order to achieve the maximum seasonal efficiency of these machines. The results of the energy saving are determined with respect to the current situation, in which all the transformers are permanently connected. On the other hand, the European Union has established a new regulation that sets the minimum energy efficiency requirements for new power transformers. This efficiency improvement is proposed to be applied gradually in two stages, a first limit came into force in 2015, while a more restrictive approach will appear in the year 2021. This work has also studied the potential energy savings that would occur when the substations of the hospital have more efficient transformers complying with the new European Regulation 548/2014.http://www.mdpi.com/1996-1073/11/2/419power transformerefficiencyseasonal efficiency
spellingShingle Carlos Javier Renedo
Agustín Santisteban
Félix Ortiz
Cristian Olmo
Alfredo Ortiz
Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital
Energies
power transformer
efficiency
seasonal efficiency
title Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital
title_full Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital
title_fullStr Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital
title_full_unstemmed Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital
title_short Evaluation of the Optimal Connection of Power Transformers in the Substations of a Hospital
title_sort evaluation of the optimal connection of power transformers in the substations of a hospital
topic power transformer
efficiency
seasonal efficiency
url http://www.mdpi.com/1996-1073/11/2/419
work_keys_str_mv AT carlosjavierrenedo evaluationoftheoptimalconnectionofpowertransformersinthesubstationsofahospital
AT agustinsantisteban evaluationoftheoptimalconnectionofpowertransformersinthesubstationsofahospital
AT felixortiz evaluationoftheoptimalconnectionofpowertransformersinthesubstationsofahospital
AT cristianolmo evaluationoftheoptimalconnectionofpowertransformersinthesubstationsofahospital
AT alfredoortiz evaluationoftheoptimalconnectionofpowertransformersinthesubstationsofahospital