Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling a...
Hlavní autoři: | , |
---|---|
Médium: | Článek |
Jazyk: | English |
Vydáno: |
Islamic Azad University, Qazvin Branch
2014-03-01
|
Edice: | Journal of Optimization in Industrial Engineering |
Témata: | |
On-line přístup: | http://www.qjie.ir/article_150_3dd6c90aed54b44669ed4ca452e0af59.pdf |