Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling a...
Príomhchruthaitheoirí: | , |
---|---|
Formáid: | Alt |
Teanga: | English |
Foilsithe / Cruthaithe: |
Islamic Azad University, Qazvin Branch
2014-03-01
|
Sraith: | Journal of Optimization in Industrial Engineering |
Ábhair: | |
Rochtain ar líne: | http://www.qjie.ir/article_150_3dd6c90aed54b44669ed4ca452e0af59.pdf |