Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling a...

Cur síos iomlán

Sonraí bibleagrafaíochta
Príomhchruthaitheoirí: Mohammad Asghari, Samaneh Nezhadali
Formáid: Alt
Teanga:English
Foilsithe / Cruthaithe: Islamic Azad University, Qazvin Branch 2014-03-01
Sraith:Journal of Optimization in Industrial Engineering
Ábhair:
Rochtain ar líne:http://www.qjie.ir/article_150_3dd6c90aed54b44669ed4ca452e0af59.pdf