Acceleration of the cycle of extended reproduction of the active part of fixed assets in construction

One of the main reasons hindering the scientific and technological development of construction and the national economy as a whole is the mismatch of the cycles of expanded reproduction of the active part of fixed assets in construction as the basic cycles of the development of construction. The ren...

Full description

Bibliographic Details
Main Author: Alekseeva Tatyana
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201821208001
_version_ 1818657400890064896
author Alekseeva Tatyana
author_facet Alekseeva Tatyana
author_sort Alekseeva Tatyana
collection DOAJ
description One of the main reasons hindering the scientific and technological development of construction and the national economy as a whole is the mismatch of the cycles of expanded reproduction of the active part of fixed assets in construction as the basic cycles of the development of construction. The renovation of the active part of the fixed assets of construction organizations in the conditions of shrinking the investment base of construction is very slow, and, as a result, there is no timely provision of construction work with the new high-performance construction equipment and vehicles. Financial leasing, as world experience shows, is an effective tool for updating the fixed assets of construction organizations, but its share is too small in the total volume of investments in the active part of fixed assets in construction. There is a need to develop new mechanisms that would ensure synchronization of the basic cycles of development in construction and contribute to the development of leasing technologies in the construction sector. As a result of scientific research, a new mechanism for accelerating the cycles of expanded reproduction of the active part of the fixed assets in construction was developed. It is titled “innovative leasing engineering,” which allows to synchronize them with construction and investment cycles, contributes to increasing the volume of financial leasing in construction, and also provides timely support and capacity of strengthening the innovation wave in construction, eventually contributing to the accelerated transition of the investment and construction complex, as well as the national economy as a whole, to a new technological order.
first_indexed 2024-12-17T03:40:53Z
format Article
id doaj.art-239b6dff404c46d4a9dec12686b57c52
institution Directory Open Access Journal
issn 2261-236X
language English
last_indexed 2024-12-17T03:40:53Z
publishDate 2018-01-01
publisher EDP Sciences
record_format Article
series MATEC Web of Conferences
spelling doaj.art-239b6dff404c46d4a9dec12686b57c522022-12-21T22:05:00ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012120800110.1051/matecconf/201821208001matecconf_icre2018_08001Acceleration of the cycle of extended reproduction of the active part of fixed assets in constructionAlekseeva Tatyana0Moscow State (National Research) University of Civil EngineeringOne of the main reasons hindering the scientific and technological development of construction and the national economy as a whole is the mismatch of the cycles of expanded reproduction of the active part of fixed assets in construction as the basic cycles of the development of construction. The renovation of the active part of the fixed assets of construction organizations in the conditions of shrinking the investment base of construction is very slow, and, as a result, there is no timely provision of construction work with the new high-performance construction equipment and vehicles. Financial leasing, as world experience shows, is an effective tool for updating the fixed assets of construction organizations, but its share is too small in the total volume of investments in the active part of fixed assets in construction. There is a need to develop new mechanisms that would ensure synchronization of the basic cycles of development in construction and contribute to the development of leasing technologies in the construction sector. As a result of scientific research, a new mechanism for accelerating the cycles of expanded reproduction of the active part of the fixed assets in construction was developed. It is titled “innovative leasing engineering,” which allows to synchronize them with construction and investment cycles, contributes to increasing the volume of financial leasing in construction, and also provides timely support and capacity of strengthening the innovation wave in construction, eventually contributing to the accelerated transition of the investment and construction complex, as well as the national economy as a whole, to a new technological order.https://doi.org/10.1051/matecconf/201821208001
spellingShingle Alekseeva Tatyana
Acceleration of the cycle of extended reproduction of the active part of fixed assets in construction
MATEC Web of Conferences
title Acceleration of the cycle of extended reproduction of the active part of fixed assets in construction
title_full Acceleration of the cycle of extended reproduction of the active part of fixed assets in construction
title_fullStr Acceleration of the cycle of extended reproduction of the active part of fixed assets in construction
title_full_unstemmed Acceleration of the cycle of extended reproduction of the active part of fixed assets in construction
title_short Acceleration of the cycle of extended reproduction of the active part of fixed assets in construction
title_sort acceleration of the cycle of extended reproduction of the active part of fixed assets in construction
url https://doi.org/10.1051/matecconf/201821208001
work_keys_str_mv AT alekseevatatyana accelerationofthecycleofextendedreproductionoftheactivepartoffixedassetsinconstruction