PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL
<p>ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model...
Main Author: | S. Munapo |
---|---|
Format: | Article |
Language: | English |
Published: |
Stellenbosch University
2012-01-01
|
Series: | South African Journal of Industrial Engineering |
Online Access: | http://sajie.journals.ac.za/pub/article/view/68 |
Similar Items
-
Investigating causes of delays and cost escalation in project execution during turnarounds
by: Mfanimpela Zacharia Mhlanga, et al.
Published: (2016-07-01) -
Innovative Ways of Developing and Using Specific Purpose Alternatives for Solving Hard Combinatorial Network Routing and Ordered Optimisation Problems
by: Santosh Kumar, et al.
Published: (2024-06-01) -
A minimum incoming weight label method and its application in CPM networks
by: E Munapo, et al.
Published: (2008-06-01) -
Solving Linear Integer Models with Variable Bounding
by: Elias Munapo, et al.
Published: (2023-05-01) -
Activity networks : project planning and control by network models /
by: 416671 Elmaghraby, Salah Eldin
Published: (1977)