نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)
Industry construction large quantities of different materials. On the other hand use of large numbers of woerkers, machinery and equibment. To carry out this task it's very important to use a practical system or a successful operation plan, within the liens of the project cost and time. Alth...
Main Author: | |
---|---|
Format: | Article |
Language: | Arabic |
Published: |
Mustansiriyah University/College of Engineering
2011-03-01
|
Series: | Journal of Engineering and Sustainable Development |
Subjects: | |
Online Access: | https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/1341 |
_version_ | 1818468497766744064 |
---|---|
author | دنيا صاحب علك |
author_facet | دنيا صاحب علك |
author_sort | دنيا صاحب علك |
collection | DOAJ |
description |
Industry construction large quantities of different materials. On the other hand use of large numbers of woerkers, machinery and equibment. To carry out this task it's very important to use a practical system or a successful operation plan, within the liens of the project cost and time. Although the availability ways to achieving the project, there is a possibility to occur a deviations from the project schedule and budget. This deviatins may be have an advantage or disadvantage to the aim of the project.In this study we follow up the progress of the work depnding on the scheme striaght and depending on the dialy progress repports. Through the comarsion between the planned and what actually achieve it showed there is a deficit in the percentage of the completion. This study use to opproach this deficit and the reprecentage of the workers use are represent a part of the materials use in the project. However we find the equation and it's application to find the optimum numder, which gives the highest rates of the implementation as shown later in this study.
|
first_indexed | 2024-04-13T21:13:01Z |
format | Article |
id | doaj.art-24a35846a2214d2088158406080950ad |
institution | Directory Open Access Journal |
issn | 2520-0917 2520-0925 |
language | Arabic |
last_indexed | 2024-04-13T21:13:01Z |
publishDate | 2011-03-01 |
publisher | Mustansiriyah University/College of Engineering |
record_format | Article |
series | Journal of Engineering and Sustainable Development |
spelling | doaj.art-24a35846a2214d2088158406080950ad2022-12-22T02:29:47ZaraMustansiriyah University/College of EngineeringJournal of Engineering and Sustainable Development2520-09172520-09252011-03-01151نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)دنيا صاحب علك0Highway and Transportation Engineering Department, Al-Mustansiriyah University, Baghdad, Iraq Industry construction large quantities of different materials. On the other hand use of large numbers of woerkers, machinery and equibment. To carry out this task it's very important to use a practical system or a successful operation plan, within the liens of the project cost and time. Although the availability ways to achieving the project, there is a possibility to occur a deviations from the project schedule and budget. This deviatins may be have an advantage or disadvantage to the aim of the project.In this study we follow up the progress of the work depnding on the scheme striaght and depending on the dialy progress repports. Through the comarsion between the planned and what actually achieve it showed there is a deficit in the percentage of the completion. This study use to opproach this deficit and the reprecentage of the workers use are represent a part of the materials use in the project. However we find the equation and it's application to find the optimum numder, which gives the highest rates of the implementation as shown later in this study. https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/1341. |
spellingShingle | دنيا صاحب علك نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة) Journal of Engineering and Sustainable Development . |
title | نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة) |
title_full | نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة) |
title_fullStr | نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة) |
title_full_unstemmed | نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة) |
title_short | نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة) |
title_sort | نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة أور دراسة حالة |
topic | . |
url | https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/1341 |
work_keys_str_mv | AT dnyạṣạḥbʿlk nẓmạlsyṭrẗʿlyạʿdạdạlʿmạlẗfyạlmsẖạryʿạlạnsẖạỷyẗllḥṣwlʿlyạlạntạjyẗạlmtẖạlyẗllʿmạlẗmsẖrwʿjsrạlqạhrẗạwrdrạsẗḥạlẗ |