نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)

Industry construction large quantities of different materials. On the other hand use of large numbers of woerkers, machinery and equibment. To carry out this task it's very important to use a practical system or a successful operation plan, within the liens of the project cost and time. Alth...

Full description

Bibliographic Details
Main Author: دنيا صاحب علك
Format: Article
Language:Arabic
Published: Mustansiriyah University/College of Engineering 2011-03-01
Series:Journal of Engineering and Sustainable Development
Subjects:
.
Online Access:https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/1341
_version_ 1818468497766744064
author دنيا صاحب علك
author_facet دنيا صاحب علك
author_sort دنيا صاحب علك
collection DOAJ
description Industry construction large quantities of different materials. On the other hand use of large numbers of woerkers, machinery and equibment. To carry out this task it's very important to use a practical system or a successful operation plan, within the liens of the project cost and time. Although the availability ways to achieving the project, there is a possibility to occur a deviations from the project schedule and budget. This deviatins may be have an advantage or disadvantage to the aim of the project.In this study we follow up the progress of the work depnding on the scheme striaght and depending on the dialy progress repports. Through the comarsion between the planned and what actually achieve it showed there is a deficit in the percentage of the completion. This study use to opproach this deficit and the reprecentage of the workers use are represent a part of the materials use in the project. However we find the equation and it's application to find the optimum numder, which gives the highest rates of the implementation as shown later in this study.    
first_indexed 2024-04-13T21:13:01Z
format Article
id doaj.art-24a35846a2214d2088158406080950ad
institution Directory Open Access Journal
issn 2520-0917
2520-0925
language Arabic
last_indexed 2024-04-13T21:13:01Z
publishDate 2011-03-01
publisher Mustansiriyah University/College of Engineering
record_format Article
series Journal of Engineering and Sustainable Development
spelling doaj.art-24a35846a2214d2088158406080950ad2022-12-22T02:29:47ZaraMustansiriyah University/College of EngineeringJournal of Engineering and Sustainable Development2520-09172520-09252011-03-01151نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)دنيا صاحب علك0Highway and Transportation Engineering Department, Al-Mustansiriyah University, Baghdad, Iraq Industry construction large quantities of different materials. On the other hand use of large numbers of woerkers, machinery and equibment. To carry out this task it's very important to use a practical system or a successful operation plan, within the liens of the project cost and time. Although the availability ways to achieving the project, there is a possibility to occur a deviations from the project schedule and budget. This deviatins may be have an advantage or disadvantage to the aim of the project.In this study we follow up the progress of the work depnding on the scheme striaght and depending on the dialy progress repports. Through the comarsion between the planned and what actually achieve it showed there is a deficit in the percentage of the completion. This study use to opproach this deficit and the reprecentage of the workers use are represent a part of the materials use in the project. However we find the equation and it's application to find the optimum numder, which gives the highest rates of the implementation as shown later in this study.    https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/1341.
spellingShingle دنيا صاحب علك
نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)
Journal of Engineering and Sustainable Development
.
title نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)
title_full نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)
title_fullStr نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)
title_full_unstemmed نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)
title_short نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة-أور (دراسة حالة)
title_sort نظم السيطرة على اعداد العمالة في المشاريع الانشائية للحصول على الانتاجية المثالية للعمالة مشروع جسر القاهرة أور دراسة حالة
topic .
url https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/1341
work_keys_str_mv AT dnyạṣạḥbʿlk nẓmạlsyṭrẗʿlyạʿdạdạlʿmạlẗfyạlmsẖạryʿạlạnsẖạỷyẗllḥṣwlʿlyạlạntạjyẗạlmtẖạlyẗllʿmạlẗmsẖrwʿjsrạlqạhrẗạwrdrạsẗḥạlẗ