Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)

This paper summarized the hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting. In addition to treatment and routine nursing, the hospital discharge preparedness and nursing was carried out. The multidisciplinary team had developed the nursing discharge plan...

Full description

Bibliographic Details
Main Authors: LI Li (李丽), XU Huajiao (许华娇), SHEN Weihong (沈卫红)
Format: Article
Language:zho
Published: Association of Integrative Nursing 2023-08-01
Series:中西医结合护理
Subjects:
Online Access:http://www.zxyjhhl.hk/thesisDetails#10.55111/j.issn2709-1961.202303091
_version_ 1797200403441385472
author LI Li (李丽)
XU Huajiao (许华娇)
SHEN Weihong (沈卫红)
author_facet LI Li (李丽)
XU Huajiao (许华娇)
SHEN Weihong (沈卫红)
author_sort LI Li (李丽)
collection DOAJ
description This paper summarized the hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting. In addition to treatment and routine nursing, the hospital discharge preparedness and nursing was carried out. The multidisciplinary team had developed the nursing discharge plan based on the risk assessment, in order to provide continuous nursing service, reduce the unplanned hospital or emergency readmission and reduce the economic and psychological burden of the patient. (本文总结1例脑卒中支架植入术后患者应用出院准备服务的护理经验。在配合治疗和常规护理的同时, 护理人员开展出院准备服务, 在患者入院后即对其进行评估, 根据评估结果, 由多学科医疗团队共同讨论, 为患者和家属提供合适的出院后照护计划, 保证患者得到持续而完整的医疗照护服务, 降低患者非计划性再次入院率及再入急诊率, 减轻患者及家属经济和精神负担。)
first_indexed 2024-03-11T19:13:49Z
format Article
id doaj.art-24a58ce600814376aa2c00f571fa6ef4
institution Directory Open Access Journal
issn 2709-1961
language zho
last_indexed 2024-04-24T07:31:06Z
publishDate 2023-08-01
publisher Association of Integrative Nursing
record_format Article
series 中西医结合护理
spelling doaj.art-24a58ce600814376aa2c00f571fa6ef42024-04-20T13:54:04ZzhoAssociation of Integrative Nursing中西医结合护理2709-19612023-08-019825125410.55111/j.issn2709-1961.202303091T202303091Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)LI Li (李丽)0XU Huajiao (许华娇)1SHEN Weihong (沈卫红)2Department of Neurology, Jinshan Hospital of Fudan University, Shanghai, 201508 (复旦大学附属金山医院 神经内科, 上海, 201508)Department of Nursing, Jinshan Hospital of Fudan University, Shanghai, 201508 (复旦大学附属金山医院 护理部, 上海, 201508)Department of Nursing, Jinshan Hospital of Fudan University, Shanghai, 201508 (复旦大学附属金山医院 护理部, 上海, 201508)This paper summarized the hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting. In addition to treatment and routine nursing, the hospital discharge preparedness and nursing was carried out. The multidisciplinary team had developed the nursing discharge plan based on the risk assessment, in order to provide continuous nursing service, reduce the unplanned hospital or emergency readmission and reduce the economic and psychological burden of the patient. (本文总结1例脑卒中支架植入术后患者应用出院准备服务的护理经验。在配合治疗和常规护理的同时, 护理人员开展出院准备服务, 在患者入院后即对其进行评估, 根据评估结果, 由多学科医疗团队共同讨论, 为患者和家属提供合适的出院后照护计划, 保证患者得到持续而完整的医疗照护服务, 降低患者非计划性再次入院率及再入急诊率, 减轻患者及家属经济和精神负担。)http://www.zxyjhhl.hk/thesisDetails#10.55111/j.issn2709-1961.202303091strokepreparedness for hospital dischargecarotid artery stentingrehabilitation traininghealth education脑卒中出院准备服务支架植入康复训练健康教育
spellingShingle LI Li (李丽)
XU Huajiao (许华娇)
SHEN Weihong (沈卫红)
Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)
中西医结合护理
stroke
preparedness for hospital discharge
carotid artery stenting
rehabilitation training
health education
脑卒中
出院准备服务
支架植入
康复训练
健康教育
title Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)
title_full Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)
title_fullStr Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)
title_full_unstemmed Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)
title_short Hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting (1例脑卒中支架植入术后患者的出院准备服务护理体会)
title_sort hospital discharge preparedness and nursing for a stroke patient with carotid artery stenting 1例脑卒中支架植入术后患者的出院准备服务护理体会
topic stroke
preparedness for hospital discharge
carotid artery stenting
rehabilitation training
health education
脑卒中
出院准备服务
支架植入
康复训练
健康教育
url http://www.zxyjhhl.hk/thesisDetails#10.55111/j.issn2709-1961.202303091
work_keys_str_mv AT lililǐlì hospitaldischargepreparednessandnursingforastrokepatientwithcarotidarterystenting1lìnǎozúzhōngzhījiàzhírùshùhòuhuànzhědechūyuànzhǔnbèifúwùhùlǐtǐhuì
AT xuhuajiaoxǔhuájiāo hospitaldischargepreparednessandnursingforastrokepatientwithcarotidarterystenting1lìnǎozúzhōngzhījiàzhírùshùhòuhuànzhědechūyuànzhǔnbèifúwùhùlǐtǐhuì
AT shenweihongshěnwèihóng hospitaldischargepreparednessandnursingforastrokepatientwithcarotidarterystenting1lìnǎozúzhōngzhījiàzhírùshùhòuhuànzhědechūyuànzhǔnbèifúwùhùlǐtǐhuì