Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd city

Introduction: Each year tens of millions of labors are victims of occupational incidents leading to the disablement or death of many of them. The present study has been conducted with the aim of predicting the performance monitoring indicators of incident after implementation of the integrated manag...

Full description

Bibliographic Details
Main Authors: F. Laal, A. Barkhordari, G. H. Halvani, R. Mirzayi
Format: Article
Language:fas
Published: Tehran University of Medical Sciences 2015-07-01
Series:بهداشت و ایمنی کار
Subjects:
Online Access:http://jhsw.tums.ac.ir/browse.php?a_code=A-10-25-127&slc_lang=en&sid=1
_version_ 1819029791370641408
author F. Laal
A. Barkhordari
G. H. Halvani
R. Mirzayi
author_facet F. Laal
A. Barkhordari
G. H. Halvani
R. Mirzayi
author_sort F. Laal
collection DOAJ
description Introduction: Each year tens of millions of labors are victims of occupational incidents leading to the disablement or death of many of them. The present study has been conducted with the aim of predicting the performance monitoring indicators of incident after implementation of the integrated management system in order to reduce number of incidents, safety monitoring, and giving priority to safety programs in the organization policies. .Matherial and Methods: Using safety performance indicators, this descriptive-analytical study has been done in two stages in a combined cycle power plant on 254 incidents before the implementation (2004) and the years after the implementation of integrated management systems(a seven year period). The required data was gathered through checklist and interview with the injured workers. Kolmogorov-Smirnov, Chi Square, and Cubic regression tests were utilized for data analysis at significance level of 0.05. .Results: Of the 1131 labors during a seven year period, 254 occupational incidents were recorded. The highest value of accident frequency rate was in 2004 (32.65) while the highest accident severity rate was in the year 2008 (209). Moreover, the lowest frequency rate and severity rate were related to the year 2011 with value of 9.75 and 29.26, respectively. Regression graphs, between the observed values and the estimated values, showed that the coefficients of all the indicators, except for β1of ASR,are significant(P< 0.05) as expected. This result implies the improvement in the safety performance and integrated management systems. .Conclusion: Findings show that Cubic regression can be an appropriate to olforinvestigating the indicators trends and for their predictionin planning and monitoring the performance ofsafety unitso that the decision-making for determining the priority of organizations’ safety programs would be facilitated.
first_indexed 2024-12-21T06:19:52Z
format Article
id doaj.art-24b3674165484350bb6a5419213d4595
institution Directory Open Access Journal
issn 2251-807X
2383-2088
language fas
last_indexed 2024-12-21T06:19:52Z
publishDate 2015-07-01
publisher Tehran University of Medical Sciences
record_format Article
series بهداشت و ایمنی کار
spelling doaj.art-24b3674165484350bb6a5419213d45952022-12-21T19:13:18ZfasTehran University of Medical Sciencesبهداشت و ایمنی کار2251-807X2383-20882015-07-01521322Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd cityF. Laal0A. Barkhordari1G. H. Halvani2R. Mirzayi3 Introduction: Each year tens of millions of labors are victims of occupational incidents leading to the disablement or death of many of them. The present study has been conducted with the aim of predicting the performance monitoring indicators of incident after implementation of the integrated management system in order to reduce number of incidents, safety monitoring, and giving priority to safety programs in the organization policies. .Matherial and Methods: Using safety performance indicators, this descriptive-analytical study has been done in two stages in a combined cycle power plant on 254 incidents before the implementation (2004) and the years after the implementation of integrated management systems(a seven year period). The required data was gathered through checklist and interview with the injured workers. Kolmogorov-Smirnov, Chi Square, and Cubic regression tests were utilized for data analysis at significance level of 0.05. .Results: Of the 1131 labors during a seven year period, 254 occupational incidents were recorded. The highest value of accident frequency rate was in 2004 (32.65) while the highest accident severity rate was in the year 2008 (209). Moreover, the lowest frequency rate and severity rate were related to the year 2011 with value of 9.75 and 29.26, respectively. Regression graphs, between the observed values and the estimated values, showed that the coefficients of all the indicators, except for β1of ASR,are significant(P< 0.05) as expected. This result implies the improvement in the safety performance and integrated management systems. .Conclusion: Findings show that Cubic regression can be an appropriate to olforinvestigating the indicators trends and for their predictionin planning and monitoring the performance ofsafety unitso that the decision-making for determining the priority of organizations’ safety programs would be facilitated.http://jhsw.tums.ac.ir/browse.php?a_code=A-10-25-127&slc_lang=en&sid=1Accident indicators Cubic Regression Combined cycle power plant
spellingShingle F. Laal
A. Barkhordari
G. H. Halvani
R. Mirzayi
Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd city
بهداشت و ایمنی کار
Accident indicators
Cubic Regression
Combined cycle power plant
title Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd city
title_full Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd city
title_fullStr Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd city
title_full_unstemmed Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd city
title_short Predicting the indicators of the safety performance monitoring after implementation of integrated management system (IMS) in a combined cycle power plant in Yazd city
title_sort predicting the indicators of the safety performance monitoring after implementation of integrated management system ims in a combined cycle power plant in yazd city
topic Accident indicators
Cubic Regression
Combined cycle power plant
url http://jhsw.tums.ac.ir/browse.php?a_code=A-10-25-127&slc_lang=en&sid=1
work_keys_str_mv AT flaal predictingtheindicatorsofthesafetyperformancemonitoringafterimplementationofintegratedmanagementsystemimsinacombinedcyclepowerplantinyazdcity
AT abarkhordari predictingtheindicatorsofthesafetyperformancemonitoringafterimplementationofintegratedmanagementsystemimsinacombinedcyclepowerplantinyazdcity
AT ghhalvani predictingtheindicatorsofthesafetyperformancemonitoringafterimplementationofintegratedmanagementsystemimsinacombinedcyclepowerplantinyazdcity
AT rmirzayi predictingtheindicatorsofthesafetyperformancemonitoringafterimplementationofintegratedmanagementsystemimsinacombinedcyclepowerplantinyazdcity