Study on the fuzzy method of the bidding-evaluating in the construction project(建设工程招标评标的模糊方法研究)
通过对招标评标的系统分析,建立了评标指标体系,提出了模糊综合评价模型和评价方法,并通过典型实例说明了模型的应用.
Main Authors: | RUANLian-fa(阮连法), WENHai-zhen(温海珍), WANGYou-sheng(汪尤升) |
---|---|
Format: | Article |
Language: | zho |
Published: |
Zhejiang University Press
2002-03-01
|
Series: | Zhejiang Daxue xuebao. Lixue ban |
Subjects: | |
Online Access: | https://doi.org/zjup/1008-9497.2002.29.2.233-240 |
Similar Items
-
The current situation of water quality in Hangzhou and comparative study of the assessment methods(杭州市区主要河道水质评价及评价方法的选择)
by: HEPing(何平), et al.
Published: (2014-05-01) -
The clarity of tourism destination image and it's evaluation index(旅游目的地形象清晰度及测评方法)
by: WUBaoqing(吴宝清), et al.
Published: (2018-05-01) -
差异与学习:模糊系统与模糊推理
by: GARIBALDI Jonathan M, et al.
Published: (2019-12-01) -
Research on the assessment of historic city conservation planning implementation based on fuzzy Delphi method(基于模糊德尔菲法的历史文化名城保护规划实施评价研究)
by: DONGWenli(董文丽), et al.
Published: (2017-11-01) -
Evaluation of port flexibility(港口柔性评价)
by: LIUGui-yun(刘桂云), et al.
Published: (2009-05-01)