Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman
Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East. Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impact...
Main Authors: | K. Alzebdeh, H.A. Bashir, S.K. Al Siyabi |
---|---|
Format: | Article |
Language: | English |
Published: |
Sultan Qaboos University
2015-06-01
|
Series: | The Journal of Engineering Research |
Subjects: | |
Online Access: | https://journals.squ.edu.om/index.php/tjer/article/view/155 |
Similar Items
-
Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman
by: Tariq Al Amri, et al.
Published: (2020-01-01) -
Causes of Time and Cost Overrun: A Case Study of Health Sector Projects in Peshawar, KP
by: Shahnawaz Khan, et al.
Published: (2019-12-01) -
Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia
by: Saad Alshihri, et al.
Published: (2022-06-01) -
Factors Leading to Cost Overrun Occurrence in Construction Projects
by: Mostafa El-Ahwal, et al.
Published: (2016-03-01) -
CAUSES OF DELAY AND COST OVERRUN FOR EDUCATIONAL BUILDING PROJECTS IN EGYPT
by: Mohamed Gebrel, et al.
Published: (2021-09-01)