Novel Risk Based Assessment of Pressure Vessels Integrity

New methodology for risk based approach to integrity assessment of pressure vessels has been introduced. Namely, the risk matrix has been defined with consequence taken as usual, whereas probability has been separated into two, emphasizing effects of human factor and material defects. Toward this en...

Full description

Bibliographic Details
Main Authors: Tamara Golubović, Aleksandar Sedmak, Vesna Spasojević Brkić, Snežana Kirin, Ivan Rakonjac
Format: Article
Language:English
Published: Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek 2018-01-01
Series:Tehnički Vjesnik
Subjects:
Online Access:https://hrcak.srce.hr/file/298276
_version_ 1827282874785595392
author Tamara Golubović
Aleksandar Sedmak
Vesna Spasojević Brkić
Snežana Kirin
Ivan Rakonjac
author_facet Tamara Golubović
Aleksandar Sedmak
Vesna Spasojević Brkić
Snežana Kirin
Ivan Rakonjac
author_sort Tamara Golubović
collection DOAJ
description New methodology for risk based approach to integrity assessment of pressure vessels has been introduced. Namely, the risk matrix has been defined with consequence taken as usual, whereas probability has been separated into two, emphasizing effects of human factor and material defects. Toward this end, the failure assessment diagram (FAD) has been used here as a simple engineering tool to estimate probability of the failure due to material defects. Probability of failure due to human factor has been estimated according to the survey performed (with operators and managers) in the firm where pressure vessel is located and operated. With consequence estimated according to the simple standard procedure or by using more complex procedures (API 581, RIMAP), the novel risk based structural assessment has been completed. As an example, cylindrical storage tanks for compressed air are analysed.
first_indexed 2024-04-24T09:25:24Z
format Article
id doaj.art-254b7baa7c6d44aa84182f6b94c32b5e
institution Directory Open Access Journal
issn 1330-3651
1848-6339
language English
last_indexed 2024-04-24T09:25:24Z
publishDate 2018-01-01
publisher Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
record_format Article
series Tehnički Vjesnik
spelling doaj.art-254b7baa7c6d44aa84182f6b94c32b5e2024-04-15T14:53:30ZengFaculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in OsijekTehnički Vjesnik1330-36511848-63392018-01-0125380380710.17559/TV-20170829144636Novel Risk Based Assessment of Pressure Vessels IntegrityTamara Golubović0Aleksandar Sedmak1Vesna Spasojević Brkić2Snežana Kirin3Ivan Rakonjac4University of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade, SerbiaUniversity of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade, SerbiaUniversity of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade, SerbiaInnovation Centre of Faculty of Mechanical, Belgrade Kraljice Marije 16, 11120 Belgrade, SerbiaEDUKONS University, Novi Sad, Faculty of Project and Innovation Management, Bože Jankovića 14, Voždovac, 11000 Belgrade, SerbiaNew methodology for risk based approach to integrity assessment of pressure vessels has been introduced. Namely, the risk matrix has been defined with consequence taken as usual, whereas probability has been separated into two, emphasizing effects of human factor and material defects. Toward this end, the failure assessment diagram (FAD) has been used here as a simple engineering tool to estimate probability of the failure due to material defects. Probability of failure due to human factor has been estimated according to the survey performed (with operators and managers) in the firm where pressure vessel is located and operated. With consequence estimated according to the simple standard procedure or by using more complex procedures (API 581, RIMAP), the novel risk based structural assessment has been completed. As an example, cylindrical storage tanks for compressed air are analysed.https://hrcak.srce.hr/file/298276pressure vesselrisk based approachstructural integrity assessmentsurvey
spellingShingle Tamara Golubović
Aleksandar Sedmak
Vesna Spasojević Brkić
Snežana Kirin
Ivan Rakonjac
Novel Risk Based Assessment of Pressure Vessels Integrity
Tehnički Vjesnik
pressure vessel
risk based approach
structural integrity assessment
survey
title Novel Risk Based Assessment of Pressure Vessels Integrity
title_full Novel Risk Based Assessment of Pressure Vessels Integrity
title_fullStr Novel Risk Based Assessment of Pressure Vessels Integrity
title_full_unstemmed Novel Risk Based Assessment of Pressure Vessels Integrity
title_short Novel Risk Based Assessment of Pressure Vessels Integrity
title_sort novel risk based assessment of pressure vessels integrity
topic pressure vessel
risk based approach
structural integrity assessment
survey
url https://hrcak.srce.hr/file/298276
work_keys_str_mv AT tamaragolubovic novelriskbasedassessmentofpressurevesselsintegrity
AT aleksandarsedmak novelriskbasedassessmentofpressurevesselsintegrity
AT vesnaspasojevicbrkic novelriskbasedassessmentofpressurevesselsintegrity
AT snezanakirin novelriskbasedassessmentofpressurevesselsintegrity
AT ivanrakonjac novelriskbasedassessmentofpressurevesselsintegrity