Delgoshaei, A., Ariffin, M. K. A. B. M., & Leman, Z. B. (2022). An Effective 4–Phased Framework for Scheduling Job-Shop Manufacturing Systems Using Weighted NSGA-II. MDPI AG.
Chicago Style (17th ed.) CitationDelgoshaei, Aidin, Mohd Khairol Anuar Bin Mohd Ariffin, and Zulkiflle B. Leman. An Effective 4–Phased Framework for Scheduling Job-Shop Manufacturing Systems Using Weighted NSGA-II. MDPI AG, 2022.
MLA (9th ed.) CitationDelgoshaei, Aidin, et al. An Effective 4–Phased Framework for Scheduling Job-Shop Manufacturing Systems Using Weighted NSGA-II. MDPI AG, 2022.
Warning: These citations may not always be 100% accurate.