An Effective 4–Phased Framework for Scheduling Job-Shop Manufacturing Systems Using Weighted NSGA-II
Improving the performance of manufacturing systems is a vital issue in today’s rival market. For this purpose, during the last decade, scientists have considered more than one objective function while scheduling a production line. This paper develops a 4-phased fuzzy framework to identify effective...
Main Authors: | Aidin Delgoshaei, Mohd Khairol Anuar Bin Mohd Ariffin, Zulkiflle B. Leman |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-12-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/10/23/4607 |
Similar Items
-
Research on Multi-Objective Low-Carbon Flexible Job Shop Scheduling Based on Improved NSGA-II
by: Zheyu Mei, et al.
Published: (2024-08-01) -
An effective 4–phased framework for scheduling job-shop manufacturing systems using weighted NSGA-II
by: Delgoshaei, Aidin, et al.
Published: (2022) -
A branch and bound and simulated annealing approach for job shop scheduling /
by: 260551 Tan, Hui Woon
Published: (2004) -
Adaptive Population NSGA-III with Dual Control Strategy for Flexible Job Shop Scheduling Problem with the Consideration of Energy Consumption and Weight
by: Mingliang Wu, et al.
Published: (2021-12-01) -
Energy-Saving Scheduling for Flexible Job Shop Problem with AGV Transportation Considering Emergencies
by: Hongliang Zhang, et al.
Published: (2023-02-01)