Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)

Agile project management pursues repetitive and continuous management through an empirical process control method considering the complexity of the project. This study aimed to propose a collaborative Building Information Modeling (BIM)-based work process, focusing on construction coordination tasks...

Full description

Bibliographic Details
Main Authors: Jae-Hyung Shim, Nam-Hyuk Ham, Jae-Jun Kim
Format: Article
Language:English
Published: MDPI AG 2024-01-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/14/2/358
_version_ 1797298672199794688
author Jae-Hyung Shim
Nam-Hyuk Ham
Jae-Jun Kim
author_facet Jae-Hyung Shim
Nam-Hyuk Ham
Jae-Jun Kim
author_sort Jae-Hyung Shim
collection DOAJ
description Agile project management pursues repetitive and continuous management through an empirical process control method considering the complexity of the project. This study aimed to propose a collaborative Building Information Modeling (BIM)-based work process, focusing on construction coordination tasks among participants during the construction phase of a project. The theoretical framework chosen for this endeavor was the Scrum framework, selected after analyzing previous research to align with the specific characteristics of construction coordination. Using the Scrum framework as a foundation, the study employed the exCPM methodology to model the collaborative BIM-based construction coordination progress. To validate the model, it underwent a transformation into a Petri-Nets model through the marked graph building block (MGBB) along with established rules for model conversion. The converted model was then subjected to validation through reachability tree analysis. The findings of this study hold applicability to diverse collaboration processes that leverage BIM in the construction industry.
first_indexed 2024-03-07T22:39:24Z
format Article
id doaj.art-2694da5c03614b66bedade818fa11d87
institution Directory Open Access Journal
issn 2075-5309
language English
last_indexed 2024-03-07T22:39:24Z
publishDate 2024-01-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj.art-2694da5c03614b66bedade818fa11d872024-02-23T15:10:00ZengMDPI AGBuildings2075-53092024-01-0114235810.3390/buildings14020358Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)Jae-Hyung Shim0Nam-Hyuk Ham1Jae-Jun Kim2Department of Architectural Engineering, Hanyang University, 222, Wangsimni-ro, Seongdong-gu, Seoul 04763, Republic of KoreaDepartment of Digital Architecture and Urban Engineering, Hanyang Cyber University, 220, Wangsimni-ro, Seongdong-gu, Seoul 04763, Republic of KoreaDepartment of Architectural Engineering, Hanyang University, 222, Wangsimni-ro, Seongdong-gu, Seoul 04763, Republic of KoreaAgile project management pursues repetitive and continuous management through an empirical process control method considering the complexity of the project. This study aimed to propose a collaborative Building Information Modeling (BIM)-based work process, focusing on construction coordination tasks among participants during the construction phase of a project. The theoretical framework chosen for this endeavor was the Scrum framework, selected after analyzing previous research to align with the specific characteristics of construction coordination. Using the Scrum framework as a foundation, the study employed the exCPM methodology to model the collaborative BIM-based construction coordination progress. To validate the model, it underwent a transformation into a Petri-Nets model through the marked graph building block (MGBB) along with established rules for model conversion. The converted model was then subjected to validation through reachability tree analysis. The findings of this study hold applicability to diverse collaboration processes that leverage BIM in the construction industry.https://www.mdpi.com/2075-5309/14/2/358Agile project managementScrum frameworkconstruction coordinationBIMexCPM
spellingShingle Jae-Hyung Shim
Nam-Hyuk Ham
Jae-Jun Kim
Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
Buildings
Agile project management
Scrum framework
construction coordination
BIM
exCPM
title Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
title_full Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
title_fullStr Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
title_full_unstemmed Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
title_short Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
title_sort collaborative bim based construction coordination progress modeling using extended collaborative process modeling excpm
topic Agile project management
Scrum framework
construction coordination
BIM
exCPM
url https://www.mdpi.com/2075-5309/14/2/358
work_keys_str_mv AT jaehyungshim collaborativebimbasedconstructioncoordinationprogressmodelingusingextendedcollaborativeprocessmodelingexcpm
AT namhyukham collaborativebimbasedconstructioncoordinationprogressmodelingusingextendedcollaborativeprocessmodelingexcpm
AT jaejunkim collaborativebimbasedconstructioncoordinationprogressmodelingusingextendedcollaborativeprocessmodelingexcpm