Redesign of Water Filter Workshop Using SLP
Workshop and factory design is one of the most important problems facing companies to enhance their performance and productivity. Facility layout issue is a fundamental fragment of accommodations planning which have a target of organize all manufacturing entities to be located as a facility having t...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Unviversity of Technology- Iraq
2020-10-01
|
Series: | Engineering and Technology Journal |
Subjects: | |
Online Access: | https://etj.uotechnology.edu.iq/article_169190_c13de116aa4233924ce9d216b755ecad.pdf |
_version_ | 1797336348028305408 |
---|---|
author | Nrjis Bassim Luma Al-Kindi |
author_facet | Nrjis Bassim Luma Al-Kindi |
author_sort | Nrjis Bassim |
collection | DOAJ |
description | Workshop and factory design is one of the most important problems facing companies to enhance their performance and productivity. Facility layout issue is a fundamental fragment of accommodations planning which have a target of organize all manufacturing entities to be located as a facility having the objective to improve manufacturing processes for an organization. The aim of this paper is to study, evaluate and then creating an improved water filter workshop adopting Muther’s (SLP) Systematic Layout Planning Procedure for increasing production and utilizing spaces. The case study in this paper is a practical one for the existing layout in Al-Faris Company in the water filter workshop. The excited layout is studied and manufacturing processes are explored with flow investigation. Activity relationship graph is molded to develop a novel layout alternative. Analyzing by using SLP technique showed that the results for the proposed layout got 341score; while the current layout got only 281 score based on the manufacturing and facility relations. The results show that, the proposed layout is much better than the existing layout of the workshop as significant reduction in the space of material handling and workflow drive and lead to increase the unit production |
first_indexed | 2024-03-08T08:53:03Z |
format | Article |
id | doaj.art-2717caa5f09e4f8bb31ab602595d5f53 |
institution | Directory Open Access Journal |
issn | 1681-6900 2412-0758 |
language | English |
last_indexed | 2024-03-08T08:53:03Z |
publishDate | 2020-10-01 |
publisher | Unviversity of Technology- Iraq |
record_format | Article |
series | Engineering and Technology Journal |
spelling | doaj.art-2717caa5f09e4f8bb31ab602595d5f532024-02-01T07:35:45ZengUnviversity of Technology- IraqEngineering and Technology Journal1681-69002412-07582020-10-013810A1430144010.30684/etj.v38i10A.564169190Redesign of Water Filter Workshop Using SLPNrjis Bassim0Luma Al-Kindi1Department of Production Engineering and Metallurgy/University of Technology, Baghdad, IraqAsst. Prof. Dr., Department of Production Engineering and Metallurgy/University of TechnologyWorkshop and factory design is one of the most important problems facing companies to enhance their performance and productivity. Facility layout issue is a fundamental fragment of accommodations planning which have a target of organize all manufacturing entities to be located as a facility having the objective to improve manufacturing processes for an organization. The aim of this paper is to study, evaluate and then creating an improved water filter workshop adopting Muther’s (SLP) Systematic Layout Planning Procedure for increasing production and utilizing spaces. The case study in this paper is a practical one for the existing layout in Al-Faris Company in the water filter workshop. The excited layout is studied and manufacturing processes are explored with flow investigation. Activity relationship graph is molded to develop a novel layout alternative. Analyzing by using SLP technique showed that the results for the proposed layout got 341score; while the current layout got only 281 score based on the manufacturing and facility relations. The results show that, the proposed layout is much better than the existing layout of the workshop as significant reduction in the space of material handling and workflow drive and lead to increase the unit productionhttps://etj.uotechnology.edu.iq/article_169190_c13de116aa4233924ce9d216b755ecad.pdfexisted layoutplant layoutprocedural approachproposed layoutslp |
spellingShingle | Nrjis Bassim Luma Al-Kindi Redesign of Water Filter Workshop Using SLP Engineering and Technology Journal existed layout plant layout procedural approach proposed layout slp |
title | Redesign of Water Filter Workshop Using SLP |
title_full | Redesign of Water Filter Workshop Using SLP |
title_fullStr | Redesign of Water Filter Workshop Using SLP |
title_full_unstemmed | Redesign of Water Filter Workshop Using SLP |
title_short | Redesign of Water Filter Workshop Using SLP |
title_sort | redesign of water filter workshop using slp |
topic | existed layout plant layout procedural approach proposed layout slp |
url | https://etj.uotechnology.edu.iq/article_169190_c13de116aa4233924ce9d216b755ecad.pdf |
work_keys_str_mv | AT nrjisbassim redesignofwaterfilterworkshopusingslp AT lumaalkindi redesignofwaterfilterworkshopusingslp |