Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance Model

The Indian construction industry is facing challenges due to performance shortfalls. The construction projects are highly complex, distinctive, fragmented and do not have of well-established performance assessment models to evaluate their project success. Assessing overall project success is not pos...

Full description

Bibliographic Details
Main Authors: Prachi Vinod Ingle, Gangadhar Mahesh
Format: Article
Language:English
Published: Ram Arti Publishers 2019-08-01
Series:International Journal of Mathematical, Engineering and Management Sciences
Subjects:
Online Access:https://www.ijmems.in/assets//71-IJMEMS-19-124-Vol.%204,%20No.%204,%20895%E2%80%93904,%202019.pdf
_version_ 1811330136303206400
author Prachi Vinod Ingle
Gangadhar Mahesh
author_facet Prachi Vinod Ingle
Gangadhar Mahesh
author_sort Prachi Vinod Ingle
collection DOAJ
description The Indian construction industry is facing challenges due to performance shortfalls. The construction projects are highly complex, distinctive, fragmented and do not have of well-established performance assessment models to evaluate their project success. Assessing overall project success is not possible to measure by single factor. To address this limitation, the Modified Project Quarter Back Rating (PQR) model was developed for the Indian construction industry. Modified PQR model’s output is a project score based on performance areas affecting project success and outcome. The model integrates ten performance areas that have identified through literature review. Performance areas included in the model are; (i) Cost (ii) Schedule (iii) Stakeholder satisfaction (iv) Safety (v) Quality (vi) Finance (vii) Environment (viii) Communication and collaboration (ix) Customer relation and (x) Productivity. These performance areas are measured through different performance metrics; i.e. performance metrics scores are aggregated to compute performance area scores. The model gives a single score that will help in comparing overall performance for different projects. This paper attempted to highlight the importance of performance metrics in modified Project Quarter Back Rating (PQR) based construction project performance assessment model for the Indian construction industry. The validity of the model needs assigning appropriate weights to the performance metrics as the weightage determines the relevance. Appropriate weights were determined using two round Delphi survey with 12 experts. Findings reveal that two performance metrics; return business from customer relation and OSHA recordable from safety have high weights. This modified PQR model will help key participants of the industry to compare the performance of various projects and to monitor performance areas that impact project performance rating.
first_indexed 2024-04-13T15:57:02Z
format Article
id doaj.art-27f2cc051d7f45ebb7cf0f9b4f43f6b9
institution Directory Open Access Journal
issn 2455-7749
2455-7749
language English
last_indexed 2024-04-13T15:57:02Z
publishDate 2019-08-01
publisher Ram Arti Publishers
record_format Article
series International Journal of Mathematical, Engineering and Management Sciences
spelling doaj.art-27f2cc051d7f45ebb7cf0f9b4f43f6b92022-12-22T02:40:39ZengRam Arti PublishersInternational Journal of Mathematical, Engineering and Management Sciences2455-77492455-77492019-08-014489590410.33889/IJMEMS.2019.4.4-071Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance ModelPrachi Vinod Ingle0Gangadhar Mahesh1Department of Civil Engineering, National Institute of Technology Karnataka, Surathkal, IndiaDepartment of Civil Engineering, National Institute of Technology Karnataka, Surathkal, IndiaThe Indian construction industry is facing challenges due to performance shortfalls. The construction projects are highly complex, distinctive, fragmented and do not have of well-established performance assessment models to evaluate their project success. Assessing overall project success is not possible to measure by single factor. To address this limitation, the Modified Project Quarter Back Rating (PQR) model was developed for the Indian construction industry. Modified PQR model’s output is a project score based on performance areas affecting project success and outcome. The model integrates ten performance areas that have identified through literature review. Performance areas included in the model are; (i) Cost (ii) Schedule (iii) Stakeholder satisfaction (iv) Safety (v) Quality (vi) Finance (vii) Environment (viii) Communication and collaboration (ix) Customer relation and (x) Productivity. These performance areas are measured through different performance metrics; i.e. performance metrics scores are aggregated to compute performance area scores. The model gives a single score that will help in comparing overall performance for different projects. This paper attempted to highlight the importance of performance metrics in modified Project Quarter Back Rating (PQR) based construction project performance assessment model for the Indian construction industry. The validity of the model needs assigning appropriate weights to the performance metrics as the weightage determines the relevance. Appropriate weights were determined using two round Delphi survey with 12 experts. Findings reveal that two performance metrics; return business from customer relation and OSHA recordable from safety have high weights. This modified PQR model will help key participants of the industry to compare the performance of various projects and to monitor performance areas that impact project performance rating.https://www.ijmems.in/assets//71-IJMEMS-19-124-Vol.%204,%20No.%204,%20895%E2%80%93904,%202019.pdfProject performanceProject successProject scoresModified PQR modelDelphi technique
spellingShingle Prachi Vinod Ingle
Gangadhar Mahesh
Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance Model
International Journal of Mathematical, Engineering and Management Sciences
Project performance
Project success
Project scores
Modified PQR model
Delphi technique
title Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance Model
title_full Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance Model
title_fullStr Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance Model
title_full_unstemmed Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance Model
title_short Assigning Weights for Modified Project Quarter Back Rating Based Construction Project Performance Model
title_sort assigning weights for modified project quarter back rating based construction project performance model
topic Project performance
Project success
Project scores
Modified PQR model
Delphi technique
url https://www.ijmems.in/assets//71-IJMEMS-19-124-Vol.%204,%20No.%204,%20895%E2%80%93904,%202019.pdf
work_keys_str_mv AT prachivinodingle assigningweightsformodifiedprojectquarterbackratingbasedconstructionprojectperformancemodel
AT gangadharmahesh assigningweightsformodifiedprojectquarterbackratingbasedconstructionprojectperformancemodel