Evaluation of paving stone production quality

The results of tests carried out for the company involved in the production of paving stones. The study used the Pareto-Lorenz diagram. After analyzing the production process 10 discrepancies were identified. The Pareto-Lorenz diagram shows that the highest value is cumulative deficiency "uneve...

Full description

Bibliographic Details
Main Author: Piotr Sygut
Format: Article
Language:English
Published: Sciendo 2015-03-01
Series:Production Engineering Archives
Subjects:
Online Access:http://www.qpij.pl/en/attachment/id/345
_version_ 1811272193042022400
author Piotr Sygut
author_facet Piotr Sygut
author_sort Piotr Sygut
collection DOAJ
description The results of tests carried out for the company involved in the production of paving stones. The study used the Pareto-Lorenz diagram. After analyzing the production process 10 discrepancies were identified. The Pareto-Lorenz diagram shows that the highest value is cumulative deficiency "uneven concrete mix to fill the form on the structural layer and a top." The results indicate that another cause of incompatibilities in terms of the cumulative value is the "poorly chosen concrete mix".
first_indexed 2024-04-12T22:35:52Z
format Article
id doaj.art-27f72973b28b4303914eab598051dbef
institution Directory Open Access Journal
issn 2353-5156
2353-7779
language English
last_indexed 2024-04-12T22:35:52Z
publishDate 2015-03-01
publisher Sciendo
record_format Article
series Production Engineering Archives
spelling doaj.art-27f72973b28b4303914eab598051dbef2022-12-22T03:13:52ZengSciendoProduction Engineering Archives2353-51562353-77792015-03-016/1(2015)1416Evaluation of paving stone production qualityPiotr Sygut0Częstochowa University of TechnologyThe results of tests carried out for the company involved in the production of paving stones. The study used the Pareto-Lorenz diagram. After analyzing the production process 10 discrepancies were identified. The Pareto-Lorenz diagram shows that the highest value is cumulative deficiency "uneven concrete mix to fill the form on the structural layer and a top." The results indicate that another cause of incompatibilities in terms of the cumulative value is the "poorly chosen concrete mix".http://www.qpij.pl/en/attachment/id/345paving stonesPareto-Lorenz diagramquality evaluation
spellingShingle Piotr Sygut
Evaluation of paving stone production quality
Production Engineering Archives
paving stones
Pareto-Lorenz diagram
quality evaluation
title Evaluation of paving stone production quality
title_full Evaluation of paving stone production quality
title_fullStr Evaluation of paving stone production quality
title_full_unstemmed Evaluation of paving stone production quality
title_short Evaluation of paving stone production quality
title_sort evaluation of paving stone production quality
topic paving stones
Pareto-Lorenz diagram
quality evaluation
url http://www.qpij.pl/en/attachment/id/345
work_keys_str_mv AT piotrsygut evaluationofpavingstoneproductionquality