Evaluation of paving stone production quality
The results of tests carried out for the company involved in the production of paving stones. The study used the Pareto-Lorenz diagram. After analyzing the production process 10 discrepancies were identified. The Pareto-Lorenz diagram shows that the highest value is cumulative deficiency "uneve...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2015-03-01
|
Series: | Production Engineering Archives |
Subjects: | |
Online Access: | http://www.qpij.pl/en/attachment/id/345 |
_version_ | 1811272193042022400 |
---|---|
author | Piotr Sygut |
author_facet | Piotr Sygut |
author_sort | Piotr Sygut |
collection | DOAJ |
description | The results of tests carried out for the company involved in the production of paving stones. The study used the Pareto-Lorenz diagram. After analyzing the production process 10 discrepancies were identified. The Pareto-Lorenz diagram shows that the highest value is cumulative deficiency "uneven concrete mix to fill the form on the structural layer and a top." The results indicate that another cause of incompatibilities in terms of the cumulative value is the "poorly chosen concrete mix". |
first_indexed | 2024-04-12T22:35:52Z |
format | Article |
id | doaj.art-27f72973b28b4303914eab598051dbef |
institution | Directory Open Access Journal |
issn | 2353-5156 2353-7779 |
language | English |
last_indexed | 2024-04-12T22:35:52Z |
publishDate | 2015-03-01 |
publisher | Sciendo |
record_format | Article |
series | Production Engineering Archives |
spelling | doaj.art-27f72973b28b4303914eab598051dbef2022-12-22T03:13:52ZengSciendoProduction Engineering Archives2353-51562353-77792015-03-016/1(2015)1416Evaluation of paving stone production qualityPiotr Sygut0Częstochowa University of TechnologyThe results of tests carried out for the company involved in the production of paving stones. The study used the Pareto-Lorenz diagram. After analyzing the production process 10 discrepancies were identified. The Pareto-Lorenz diagram shows that the highest value is cumulative deficiency "uneven concrete mix to fill the form on the structural layer and a top." The results indicate that another cause of incompatibilities in terms of the cumulative value is the "poorly chosen concrete mix".http://www.qpij.pl/en/attachment/id/345paving stonesPareto-Lorenz diagramquality evaluation |
spellingShingle | Piotr Sygut Evaluation of paving stone production quality Production Engineering Archives paving stones Pareto-Lorenz diagram quality evaluation |
title | Evaluation of paving stone production quality |
title_full | Evaluation of paving stone production quality |
title_fullStr | Evaluation of paving stone production quality |
title_full_unstemmed | Evaluation of paving stone production quality |
title_short | Evaluation of paving stone production quality |
title_sort | evaluation of paving stone production quality |
topic | paving stones Pareto-Lorenz diagram quality evaluation |
url | http://www.qpij.pl/en/attachment/id/345 |
work_keys_str_mv | AT piotrsygut evaluationofpavingstoneproductionquality |