Trade-Off Curves for Performance Optimization in a Crushing Plant
Operational flexibility in an aggregate production process is required to adapt to changes in customer demands. Excessive demand for a particular product fraction can lead to operational alteration wherein re-crushing of the existing larger-sized product fraction is necessary. The choice of re-crush...
Main Authors: | Kanishk Bhadani, Gauti Asbjörnsson, Monica Soldinger Almefelt, Erik Hulthén, Magnus Evertsson |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-09-01
|
Series: | Minerals |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-163X/13/10/1242 |
Similar Items
-
Applied Calibration and Validation Method of Dynamic Process Simulation for Crushing Plants
by: Kanishk Bhadani, et al.
Published: (2021-08-01) -
Application of Optimization Method for Calibration and Maintenance of Power-Based Belt Scale
by: Kanishk Bhadani, et al.
Published: (2021-04-01) -
Fit-for-Purpose VSI Modelling Framework for Process Simulation
by: Simon Grunditz, et al.
Published: (2020-12-01) -
Evaluation of the crushing method impact on the mineral liberation in pre-concentration circuits
by: André Hiroshi Asakawa, et al.
Published: (2024-04-01) -
Truths and misconceptions in the ore comminution
by: Magdalinović Nedeljko
Published: (2016-01-01)