Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)

A flyover builds to solve traffic problems in several areas. Girder often uses in flyover construction, but the use of Corrugated Foam Mortar Pusjatan is relatively new in Indonesia. This study aims to compare the cost and time of flyover construction using two different methods, Corrugated Foam Mor...

Full description

Bibliographic Details
Main Authors: Riadi Henry, Sujana Caroline Maretha
Format: Article
Language:English
Published: EDP Sciences 2024-01-01
Series:E3S Web of Conferences
Subjects:
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2024/06/e3sconf_aisce2023_01039.pdf
_version_ 1797343532794511360
author Riadi Henry
Sujana Caroline Maretha
author_facet Riadi Henry
Sujana Caroline Maretha
author_sort Riadi Henry
collection DOAJ
description A flyover builds to solve traffic problems in several areas. Girder often uses in flyover construction, but the use of Corrugated Foam Mortar Pusjatan is relatively new in Indonesia. This study aims to compare the cost and time of flyover construction using two different methods, Corrugated Foam Mortar and Girder. The comparison did for the same structural length of flyover 983.5 m. As a result, The Corrugated Foam Mortar method costs Rp. 46,463,841,131.40 and needs 201 days for completion, while the Girder costs Rp. 71,313,005,779.77 and needs 436 days. Based on the results, the Corrugated Foam Mortar method is 34% cheaper about Rp. 24,849,169,648.37 and 54% faster, with a time difference of 235 days faster than the girders. The cause of the biggest cost difference is material cost.
first_indexed 2024-03-08T10:49:01Z
format Article
id doaj.art-2872daa9fdbc49f48ce0508affc7ab07
institution Directory Open Access Journal
issn 2267-1242
language English
last_indexed 2024-03-08T10:49:01Z
publishDate 2024-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj.art-2872daa9fdbc49f48ce0508affc7ab072024-01-26T16:52:05ZengEDP SciencesE3S Web of Conferences2267-12422024-01-014760103910.1051/e3sconf/202447601039e3sconf_aisce2023_01039Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)Riadi Henry0Sujana Caroline Maretha1Civil Engineering, Faculty of Engineering, BINUS UniversityCivil Engineering, Faculty of Engineering, BINUS UniversityA flyover builds to solve traffic problems in several areas. Girder often uses in flyover construction, but the use of Corrugated Foam Mortar Pusjatan is relatively new in Indonesia. This study aims to compare the cost and time of flyover construction using two different methods, Corrugated Foam Mortar and Girder. The comparison did for the same structural length of flyover 983.5 m. As a result, The Corrugated Foam Mortar method costs Rp. 46,463,841,131.40 and needs 201 days for completion, while the Girder costs Rp. 71,313,005,779.77 and needs 436 days. Based on the results, the Corrugated Foam Mortar method is 34% cheaper about Rp. 24,849,169,648.37 and 54% faster, with a time difference of 235 days faster than the girders. The cause of the biggest cost difference is material cost.https://www.e3s-conferences.org/articles/e3sconf/pdf/2024/06/e3sconf_aisce2023_01039.pdfflyovercosttimecorrugated foam mortargirder
spellingShingle Riadi Henry
Sujana Caroline Maretha
Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)
E3S Web of Conferences
flyover
cost
time
corrugated foam mortar
girder
title Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)
title_full Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)
title_fullStr Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)
title_full_unstemmed Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)
title_short Cost and Time Comparison between Corrugated Foam Mortar Technology and Girders (Study Case on Martadinata Pamulang Flyover Project)
title_sort cost and time comparison between corrugated foam mortar technology and girders study case on martadinata pamulang flyover project
topic flyover
cost
time
corrugated foam mortar
girder
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2024/06/e3sconf_aisce2023_01039.pdf
work_keys_str_mv AT riadihenry costandtimecomparisonbetweencorrugatedfoammortartechnologyandgirdersstudycaseonmartadinatapamulangflyoverproject
AT sujanacarolinemaretha costandtimecomparisonbetweencorrugatedfoammortartechnologyandgirdersstudycaseonmartadinatapamulangflyoverproject