CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)
Historical Building Information Modeling (H-BIM) has been widely documented in literature and is becoming more popular with government bodies, who are increasingly choosing to make its use mandatory in public procurements and contracts. Although the system seems to be one of the best approaches fo...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2017-05-01
|
Series: | The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences |
Online Access: | http://www.int-arch-photogramm-remote-sens-spatial-inf-sci.net/XLII-5-W1/253/2017/isprs-archives-XLII-5-W1-253-2017.pdf |
_version_ | 1819128751201452032 |
---|---|
author | V. Donato C. Biagini G. Bertini F. Marsugli |
author_facet | V. Donato C. Biagini G. Bertini F. Marsugli |
author_sort | V. Donato |
collection | DOAJ |
description | Historical Building Information Modeling (H-BIM) has been widely documented in literature and is becoming more popular with
government bodies, who are increasingly choosing to make its use mandatory in public procurements and contracts. Although the
system seems to be one of the best approaches for managing data and driving the decision-making process, several difficulties arise
due to the amount of effort required in the initial phases, when the data derived from a geometrical survey must be converted into
parametric elements. Moreover, users must decide on a “level of geometrical simplification” a long time in advance, and this inevitably
leads to a loss of geometrical data.
<br><br>
From this perspective, our research describes a procedure to optimize the workflow of information for existing artefacts, in order to
achieve a “lean” H-BIM. In this article, we will analyse two aspects: the first relates to the level of accuracy in a digital model created
from the two different point clouds achieved from laser scanner and form images, while the second concerns the conversion of this
information into parametric elements (Building Object Models- BOMs) that need to have specific characteristics.
<br><br>
The case study we are presenting is the “Ponte Giorgini” (“Giorgini Bridge”) in Castiglione della Pescaia (Grosseto – Italy). |
first_indexed | 2024-12-22T08:32:48Z |
format | Article |
id | doaj.art-29702e2307e042649b70a526781caa68 |
institution | Directory Open Access Journal |
issn | 1682-1750 2194-9034 |
language | English |
last_indexed | 2024-12-22T08:32:48Z |
publishDate | 2017-05-01 |
publisher | Copernicus Publications |
record_format | Article |
series | The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences |
spelling | doaj.art-29702e2307e042649b70a526781caa682022-12-21T18:32:26ZengCopernicus PublicationsThe International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences1682-17502194-90342017-05-01XLII-5-W125326010.5194/isprs-archives-XLII-5-W1-253-2017CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)V. Donato0C. Biagini1G. Bertini2F. Marsugli3DISEG, Dept. of Structural, Geotechnical and Building Engineering, Polytechnic of Turin, 10129, ItalyDIDA, Dept. of Architecture, Univ. of Florence, 50123, ItalyBuilding EngineerSchool of the Architectural and Landscape Heritage, DIDA, Dept. of Architecture, Univ. of Florence, ItalyHistorical Building Information Modeling (H-BIM) has been widely documented in literature and is becoming more popular with government bodies, who are increasingly choosing to make its use mandatory in public procurements and contracts. Although the system seems to be one of the best approaches for managing data and driving the decision-making process, several difficulties arise due to the amount of effort required in the initial phases, when the data derived from a geometrical survey must be converted into parametric elements. Moreover, users must decide on a “level of geometrical simplification” a long time in advance, and this inevitably leads to a loss of geometrical data. <br><br> From this perspective, our research describes a procedure to optimize the workflow of information for existing artefacts, in order to achieve a “lean” H-BIM. In this article, we will analyse two aspects: the first relates to the level of accuracy in a digital model created from the two different point clouds achieved from laser scanner and form images, while the second concerns the conversion of this information into parametric elements (Building Object Models- BOMs) that need to have specific characteristics. <br><br> The case study we are presenting is the “Ponte Giorgini” (“Giorgini Bridge”) in Castiglione della Pescaia (Grosseto – Italy).http://www.int-arch-photogramm-remote-sens-spatial-inf-sci.net/XLII-5-W1/253/2017/isprs-archives-XLII-5-W1-253-2017.pdf |
spellingShingle | V. Donato C. Biagini G. Bertini F. Marsugli CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY) The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences |
title | CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM
WITH REGARDS TO HISTORICAL INFRASTRUCTURES:
A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA
(GROSSETO – ITALY) |
title_full | CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM
WITH REGARDS TO HISTORICAL INFRASTRUCTURES:
A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA
(GROSSETO – ITALY) |
title_fullStr | CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM
WITH REGARDS TO HISTORICAL INFRASTRUCTURES:
A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA
(GROSSETO – ITALY) |
title_full_unstemmed | CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM
WITH REGARDS TO HISTORICAL INFRASTRUCTURES:
A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA
(GROSSETO – ITALY) |
title_short | CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM
WITH REGARDS TO HISTORICAL INFRASTRUCTURES:
A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA
(GROSSETO – ITALY) |
title_sort | challenges and opportunities for the implementation of h bim with regards to historical infrastructures a case study of the ponte giorgini in castiglione della pescaia grosseto italy |
url | http://www.int-arch-photogramm-remote-sens-spatial-inf-sci.net/XLII-5-W1/253/2017/isprs-archives-XLII-5-W1-253-2017.pdf |
work_keys_str_mv | AT vdonato challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly AT cbiagini challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly AT gbertini challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly AT fmarsugli challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly |