CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)

Historical Building Information Modeling (H-BIM) has been widely documented in literature and is becoming more popular with government bodies, who are increasingly choosing to make its use mandatory in public procurements and contracts. Although the system seems to be one of the best approaches fo...

Full description

Bibliographic Details
Main Authors: V. Donato, C. Biagini, G. Bertini, F. Marsugli
Format: Article
Language:English
Published: Copernicus Publications 2017-05-01
Series:The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
Online Access:http://www.int-arch-photogramm-remote-sens-spatial-inf-sci.net/XLII-5-W1/253/2017/isprs-archives-XLII-5-W1-253-2017.pdf
_version_ 1819128751201452032
author V. Donato
C. Biagini
G. Bertini
F. Marsugli
author_facet V. Donato
C. Biagini
G. Bertini
F. Marsugli
author_sort V. Donato
collection DOAJ
description Historical Building Information Modeling (H-BIM) has been widely documented in literature and is becoming more popular with government bodies, who are increasingly choosing to make its use mandatory in public procurements and contracts. Although the system seems to be one of the best approaches for managing data and driving the decision-making process, several difficulties arise due to the amount of effort required in the initial phases, when the data derived from a geometrical survey must be converted into parametric elements. Moreover, users must decide on a “level of geometrical simplification” a long time in advance, and this inevitably leads to a loss of geometrical data. <br><br> From this perspective, our research describes a procedure to optimize the workflow of information for existing artefacts, in order to achieve a “lean” H-BIM. In this article, we will analyse two aspects: the first relates to the level of accuracy in a digital model created from the two different point clouds achieved from laser scanner and form images, while the second concerns the conversion of this information into parametric elements (Building Object Models- BOMs) that need to have specific characteristics. <br><br> The case study we are presenting is the “Ponte Giorgini” (“Giorgini Bridge”) in Castiglione della Pescaia (Grosseto – Italy).
first_indexed 2024-12-22T08:32:48Z
format Article
id doaj.art-29702e2307e042649b70a526781caa68
institution Directory Open Access Journal
issn 1682-1750
2194-9034
language English
last_indexed 2024-12-22T08:32:48Z
publishDate 2017-05-01
publisher Copernicus Publications
record_format Article
series The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
spelling doaj.art-29702e2307e042649b70a526781caa682022-12-21T18:32:26ZengCopernicus PublicationsThe International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences1682-17502194-90342017-05-01XLII-5-W125326010.5194/isprs-archives-XLII-5-W1-253-2017CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)V. Donato0C. Biagini1G. Bertini2F. Marsugli3DISEG, Dept. of Structural, Geotechnical and Building Engineering, Polytechnic of Turin, 10129, ItalyDIDA, Dept. of Architecture, Univ. of Florence, 50123, ItalyBuilding EngineerSchool of the Architectural and Landscape Heritage, DIDA, Dept. of Architecture, Univ. of Florence, ItalyHistorical Building Information Modeling (H-BIM) has been widely documented in literature and is becoming more popular with government bodies, who are increasingly choosing to make its use mandatory in public procurements and contracts. Although the system seems to be one of the best approaches for managing data and driving the decision-making process, several difficulties arise due to the amount of effort required in the initial phases, when the data derived from a geometrical survey must be converted into parametric elements. Moreover, users must decide on a “level of geometrical simplification” a long time in advance, and this inevitably leads to a loss of geometrical data. <br><br> From this perspective, our research describes a procedure to optimize the workflow of information for existing artefacts, in order to achieve a “lean” H-BIM. In this article, we will analyse two aspects: the first relates to the level of accuracy in a digital model created from the two different point clouds achieved from laser scanner and form images, while the second concerns the conversion of this information into parametric elements (Building Object Models- BOMs) that need to have specific characteristics. <br><br> The case study we are presenting is the “Ponte Giorgini” (“Giorgini Bridge”) in Castiglione della Pescaia (Grosseto – Italy).http://www.int-arch-photogramm-remote-sens-spatial-inf-sci.net/XLII-5-W1/253/2017/isprs-archives-XLII-5-W1-253-2017.pdf
spellingShingle V. Donato
C. Biagini
G. Bertini
F. Marsugli
CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)
The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
title CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)
title_full CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)
title_fullStr CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)
title_full_unstemmed CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)
title_short CHALLENGES AND OPPORTUNITIES FOR THE IMPLEMENTATION OF H-BIM WITH REGARDS TO HISTORICAL INFRASTRUCTURES: A CASE STUDY OF THE PONTE GIORGINI IN CASTIGLIONE DELLA PESCAIA (GROSSETO – ITALY)
title_sort challenges and opportunities for the implementation of h bim with regards to historical infrastructures a case study of the ponte giorgini in castiglione della pescaia grosseto italy
url http://www.int-arch-photogramm-remote-sens-spatial-inf-sci.net/XLII-5-W1/253/2017/isprs-archives-XLII-5-W1-253-2017.pdf
work_keys_str_mv AT vdonato challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly
AT cbiagini challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly
AT gbertini challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly
AT fmarsugli challengesandopportunitiesfortheimplementationofhbimwithregardstohistoricalinfrastructuresacasestudyofthepontegiorginiincastiglionedellapescaiagrossetoitaly