Design of distributed synchronous acquisition system of seam seismic data
In order to synchronize various collection terminals with each other and synchronize two- channel in the same collection terminal in acquisition system of seam seismic data,a distributed two-channel synchronous acquisition system of seam seismic data was designed. The system applies a weak signal co...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2017-03-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.03.001 |
_version_ | 1797868829507846144 |
---|---|
author | HUANG San ZHANG Faquan YE Jincai WANG Guofu WANG Xiaohong |
author_facet | HUANG San ZHANG Faquan YE Jincai WANG Guofu WANG Xiaohong |
author_sort | HUANG San |
collection | DOAJ |
description | In order to synchronize various collection terminals with each other and synchronize two- channel in the same collection terminal in acquisition system of seam seismic data,a distributed two-channel synchronous acquisition system of seam seismic data was designed. The system applies a weak signal conditioning circuit to improve signal-to-noise ratio of seismic signal, and uses eight-channel synchronization sampling core to realize synchronization sampling of two-channel in the same collection terminal.A clock synchronization system is constructed which is composed of GPS receiver, digital phase lock loop and STM32 main controller. The adaptive oscillator model drift correction algorithm is used to predict and estimate temperature-drift characteristic and aging characteristic of oven controlled crystal oscillator, so as to realize clock synchronization and time synchronization of various collection terminals in coal mines. The test results show that the system realizes distributed synchronous acquisition of multi-channel seismic signal, the accuracy of synchronization between the different data collection terminals is better than 10 μs within 8 hours continuous work in underground coal mine. |
first_indexed | 2024-04-10T00:03:05Z |
format | Article |
id | doaj.art-2a803103ee7843338b6bb89639f9123d |
institution | Directory Open Access Journal |
issn | 1671-251X |
language | zho |
last_indexed | 2024-04-10T00:03:05Z |
publishDate | 2017-03-01 |
publisher | Editorial Department of Industry and Mine Automation |
record_format | Article |
series | Gong-kuang zidonghua |
spelling | doaj.art-2a803103ee7843338b6bb89639f9123d2023-03-17T01:41:39ZzhoEditorial Department of Industry and Mine AutomationGong-kuang zidonghua1671-251X2017-03-014331610.13272/j.issn.1671-251x.2017.03.001Design of distributed synchronous acquisition system of seam seismic dataHUANG San0ZHANG FaquanYE Jincai1WANG Guofu2WANG Xiaohong3School of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaSchool of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaSchool of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaSchool of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaIn order to synchronize various collection terminals with each other and synchronize two- channel in the same collection terminal in acquisition system of seam seismic data,a distributed two-channel synchronous acquisition system of seam seismic data was designed. The system applies a weak signal conditioning circuit to improve signal-to-noise ratio of seismic signal, and uses eight-channel synchronization sampling core to realize synchronization sampling of two-channel in the same collection terminal.A clock synchronization system is constructed which is composed of GPS receiver, digital phase lock loop and STM32 main controller. The adaptive oscillator model drift correction algorithm is used to predict and estimate temperature-drift characteristic and aging characteristic of oven controlled crystal oscillator, so as to realize clock synchronization and time synchronization of various collection terminals in coal mines. The test results show that the system realizes distributed synchronous acquisition of multi-channel seismic signal, the accuracy of synchronization between the different data collection terminals is better than 10 μs within 8 hours continuous work in underground coal mine.http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.03.001coal miningseam seismic monitoringdata acquisitionsynchronous samplingaom drift correction algorithmocxo |
spellingShingle | HUANG San ZHANG Faquan YE Jincai WANG Guofu WANG Xiaohong Design of distributed synchronous acquisition system of seam seismic data Gong-kuang zidonghua coal mining seam seismic monitoring data acquisition synchronous sampling aom drift correction algorithm ocxo |
title | Design of distributed synchronous acquisition system of seam seismic data |
title_full | Design of distributed synchronous acquisition system of seam seismic data |
title_fullStr | Design of distributed synchronous acquisition system of seam seismic data |
title_full_unstemmed | Design of distributed synchronous acquisition system of seam seismic data |
title_short | Design of distributed synchronous acquisition system of seam seismic data |
title_sort | design of distributed synchronous acquisition system of seam seismic data |
topic | coal mining seam seismic monitoring data acquisition synchronous sampling aom drift correction algorithm ocxo |
url | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.03.001 |
work_keys_str_mv | AT huangsan designofdistributedsynchronousacquisitionsystemofseamseismicdata AT zhangfaquan designofdistributedsynchronousacquisitionsystemofseamseismicdata AT yejincai designofdistributedsynchronousacquisitionsystemofseamseismicdata AT wangguofu designofdistributedsynchronousacquisitionsystemofseamseismicdata AT wangxiaohong designofdistributedsynchronousacquisitionsystemofseamseismicdata |