Design of distributed synchronous acquisition system of seam seismic data

In order to synchronize various collection terminals with each other and synchronize two- channel in the same collection terminal in acquisition system of seam seismic data,a distributed two-channel synchronous acquisition system of seam seismic data was designed. The system applies a weak signal co...

Full description

Bibliographic Details
Main Authors: HUANG San, ZHANG Faquan, YE Jincai, WANG Guofu, WANG Xiaohong
Format: Article
Language:zho
Published: Editorial Department of Industry and Mine Automation 2017-03-01
Series:Gong-kuang zidonghua
Subjects:
Online Access:http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.03.001
_version_ 1797868829507846144
author HUANG San
ZHANG Faquan
YE Jincai
WANG Guofu
WANG Xiaohong
author_facet HUANG San
ZHANG Faquan
YE Jincai
WANG Guofu
WANG Xiaohong
author_sort HUANG San
collection DOAJ
description In order to synchronize various collection terminals with each other and synchronize two- channel in the same collection terminal in acquisition system of seam seismic data,a distributed two-channel synchronous acquisition system of seam seismic data was designed. The system applies a weak signal conditioning circuit to improve signal-to-noise ratio of seismic signal, and uses eight-channel synchronization sampling core to realize synchronization sampling of two-channel in the same collection terminal.A clock synchronization system is constructed which is composed of GPS receiver, digital phase lock loop and STM32 main controller. The adaptive oscillator model drift correction algorithm is used to predict and estimate temperature-drift characteristic and aging characteristic of oven controlled crystal oscillator, so as to realize clock synchronization and time synchronization of various collection terminals in coal mines. The test results show that the system realizes distributed synchronous acquisition of multi-channel seismic signal, the accuracy of synchronization between the different data collection terminals is better than 10 μs within 8 hours continuous work in underground coal mine.
first_indexed 2024-04-10T00:03:05Z
format Article
id doaj.art-2a803103ee7843338b6bb89639f9123d
institution Directory Open Access Journal
issn 1671-251X
language zho
last_indexed 2024-04-10T00:03:05Z
publishDate 2017-03-01
publisher Editorial Department of Industry and Mine Automation
record_format Article
series Gong-kuang zidonghua
spelling doaj.art-2a803103ee7843338b6bb89639f9123d2023-03-17T01:41:39ZzhoEditorial Department of Industry and Mine AutomationGong-kuang zidonghua1671-251X2017-03-014331610.13272/j.issn.1671-251x.2017.03.001Design of distributed synchronous acquisition system of seam seismic dataHUANG San0ZHANG FaquanYE Jincai1WANG Guofu2WANG Xiaohong3School of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaSchool of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaSchool of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaSchool of Information and Communication, Guilin University of Electronic Technology, Guilin 541004, ChinaIn order to synchronize various collection terminals with each other and synchronize two- channel in the same collection terminal in acquisition system of seam seismic data,a distributed two-channel synchronous acquisition system of seam seismic data was designed. The system applies a weak signal conditioning circuit to improve signal-to-noise ratio of seismic signal, and uses eight-channel synchronization sampling core to realize synchronization sampling of two-channel in the same collection terminal.A clock synchronization system is constructed which is composed of GPS receiver, digital phase lock loop and STM32 main controller. The adaptive oscillator model drift correction algorithm is used to predict and estimate temperature-drift characteristic and aging characteristic of oven controlled crystal oscillator, so as to realize clock synchronization and time synchronization of various collection terminals in coal mines. The test results show that the system realizes distributed synchronous acquisition of multi-channel seismic signal, the accuracy of synchronization between the different data collection terminals is better than 10 μs within 8 hours continuous work in underground coal mine.http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.03.001coal miningseam seismic monitoringdata acquisitionsynchronous samplingaom drift correction algorithmocxo
spellingShingle HUANG San
ZHANG Faquan
YE Jincai
WANG Guofu
WANG Xiaohong
Design of distributed synchronous acquisition system of seam seismic data
Gong-kuang zidonghua
coal mining
seam seismic monitoring
data acquisition
synchronous sampling
aom drift correction algorithm
ocxo
title Design of distributed synchronous acquisition system of seam seismic data
title_full Design of distributed synchronous acquisition system of seam seismic data
title_fullStr Design of distributed synchronous acquisition system of seam seismic data
title_full_unstemmed Design of distributed synchronous acquisition system of seam seismic data
title_short Design of distributed synchronous acquisition system of seam seismic data
title_sort design of distributed synchronous acquisition system of seam seismic data
topic coal mining
seam seismic monitoring
data acquisition
synchronous sampling
aom drift correction algorithm
ocxo
url http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2017.03.001
work_keys_str_mv AT huangsan designofdistributedsynchronousacquisitionsystemofseamseismicdata
AT zhangfaquan designofdistributedsynchronousacquisitionsystemofseamseismicdata
AT yejincai designofdistributedsynchronousacquisitionsystemofseamseismicdata
AT wangguofu designofdistributedsynchronousacquisitionsystemofseamseismicdata
AT wangxiaohong designofdistributedsynchronousacquisitionsystemofseamseismicdata