PREDICTION OF ROAD CLEARANCE
One method of handling soil that can be done to speed up the consolidation process is to add a Pre-Loading embankment on top of the plan embankment. In addition, this handling is also carried out to achieve a reduction by the design load, so that the settlement of embankment after the construction p...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Kristen Maranatha
2022-04-01
|
Series: | Jurnal Teknik Sipil |
Subjects: | |
Online Access: | https://journal.maranatha.edu/index.php/jts/article/view/4592 |
_version_ | 1797813509656936448 |
---|---|
author | Bartholomeus Humisar Pasaribu |
author_facet | Bartholomeus Humisar Pasaribu |
author_sort | Bartholomeus |
collection | DOAJ |
description | One method of handling soil that can be done to speed up the consolidation process is to add a Pre-Loading embankment on top of the plan embankment. In addition, this handling is also carried out to achieve a reduction by the design load, so that the settlement of embankment after the construction period still meets the required criteria and standards. This study was conducted to obtain a comparison of the prediction of embankment settlement with the empirical method using CPT data and the prediction of settlement using the Asaoka Method. In addition, the results of the consolidation coefficient will also be compared which can be used to determine the right time for Pre-Loading excavation during the construction period. The data used are CPT test data in the field as well as laboratory test data and measurement data for the settlement plate settlement closest to the position of the CPT test. From the analysis carried out, it is obtained that the prediction of decline using the Asaoka method is smaller than the prediction of decline using the empirical method using CPT data. In addition, from the analysis, it was found that at locations HB-04 and SP 70, as well as HB-07 and SP 91, showed laboratory consolidation coefficient values (cv-Lab.) which were close to the consolidation coefficients of the Asaoka Method (cv-Asa.), while in HB -05 and SP 79 and HB-06 and SP 85 show a large difference in values. The average comparison of the cv-Lab. consolidation coefficients and CV-Asa. is 58.5%. |
first_indexed | 2024-03-13T07:53:49Z |
format | Article |
id | doaj.art-2afdf23450bd4839877c0b4153ed8f94 |
institution | Directory Open Access Journal |
issn | 1411-9331 2549-7219 |
language | English |
last_indexed | 2024-03-13T07:53:49Z |
publishDate | 2022-04-01 |
publisher | Universitas Kristen Maranatha |
record_format | Article |
series | Jurnal Teknik Sipil |
spelling | doaj.art-2afdf23450bd4839877c0b4153ed8f942023-06-02T09:22:12ZengUniversitas Kristen MaranathaJurnal Teknik Sipil1411-93312549-72192022-04-0118116618410.28932/jts.v18i1.45924214PREDICTION OF ROAD CLEARANCEBartholomeus0Humisar Pasaribu1Universitas HKBP NommensenUniversitas HKBP NommensenOne method of handling soil that can be done to speed up the consolidation process is to add a Pre-Loading embankment on top of the plan embankment. In addition, this handling is also carried out to achieve a reduction by the design load, so that the settlement of embankment after the construction period still meets the required criteria and standards. This study was conducted to obtain a comparison of the prediction of embankment settlement with the empirical method using CPT data and the prediction of settlement using the Asaoka Method. In addition, the results of the consolidation coefficient will also be compared which can be used to determine the right time for Pre-Loading excavation during the construction period. The data used are CPT test data in the field as well as laboratory test data and measurement data for the settlement plate settlement closest to the position of the CPT test. From the analysis carried out, it is obtained that the prediction of decline using the Asaoka method is smaller than the prediction of decline using the empirical method using CPT data. In addition, from the analysis, it was found that at locations HB-04 and SP 70, as well as HB-07 and SP 91, showed laboratory consolidation coefficient values (cv-Lab.) which were close to the consolidation coefficients of the Asaoka Method (cv-Asa.), while in HB -05 and SP 79 and HB-06 and SP 85 show a large difference in values. The average comparison of the cv-Lab. consolidation coefficients and CV-Asa. is 58.5%.https://journal.maranatha.edu/index.php/jts/article/view/4592cptconsolidationasaoka methodpre-loadingsettlement plate |
spellingShingle | Bartholomeus Humisar Pasaribu PREDICTION OF ROAD CLEARANCE Jurnal Teknik Sipil cpt consolidation asaoka method pre-loading settlement plate |
title | PREDICTION OF ROAD CLEARANCE |
title_full | PREDICTION OF ROAD CLEARANCE |
title_fullStr | PREDICTION OF ROAD CLEARANCE |
title_full_unstemmed | PREDICTION OF ROAD CLEARANCE |
title_short | PREDICTION OF ROAD CLEARANCE |
title_sort | prediction of road clearance |
topic | cpt consolidation asaoka method pre-loading settlement plate |