PREDICTION OF ROAD CLEARANCE

One method of handling soil that can be done to speed up the consolidation process is to add a Pre-Loading embankment on top of the plan embankment. In addition, this handling is also carried out to achieve a reduction by the design load, so that the settlement of embankment after the construction p...

Full description

Bibliographic Details
Main Authors: Bartholomeus, Humisar Pasaribu
Format: Article
Language:English
Published: Universitas Kristen Maranatha 2022-04-01
Series:Jurnal Teknik Sipil
Subjects:
Online Access:https://journal.maranatha.edu/index.php/jts/article/view/4592
_version_ 1797813509656936448
author Bartholomeus
Humisar Pasaribu
author_facet Bartholomeus
Humisar Pasaribu
author_sort Bartholomeus
collection DOAJ
description One method of handling soil that can be done to speed up the consolidation process is to add a Pre-Loading embankment on top of the plan embankment. In addition, this handling is also carried out to achieve a reduction by the design load, so that the settlement of embankment after the construction period still meets the required criteria and standards. This study was conducted to obtain a comparison of the prediction of embankment settlement with the empirical method using CPT data and the prediction of settlement using the Asaoka Method. In addition, the results of the consolidation coefficient will also be compared which can be used to determine the right time for Pre-Loading excavation during the construction period. The data used are CPT test data in the field as well as laboratory test data and measurement data for the settlement plate settlement closest to the position of the CPT test. From the analysis carried out, it is obtained that the prediction of decline using the Asaoka method is smaller than the prediction of decline using the empirical method using CPT data. In addition, from the analysis, it was found that at locations HB-04 and SP 70, as well as HB-07 and SP 91, showed laboratory consolidation coefficient values (cv-Lab.) which were close to the consolidation coefficients of the Asaoka Method (cv-Asa.), while in HB -05 and SP 79 and HB-06 and SP 85 show a large difference in values. The average comparison of the cv-Lab. consolidation coefficients and CV-Asa. is 58.5%.
first_indexed 2024-03-13T07:53:49Z
format Article
id doaj.art-2afdf23450bd4839877c0b4153ed8f94
institution Directory Open Access Journal
issn 1411-9331
2549-7219
language English
last_indexed 2024-03-13T07:53:49Z
publishDate 2022-04-01
publisher Universitas Kristen Maranatha
record_format Article
series Jurnal Teknik Sipil
spelling doaj.art-2afdf23450bd4839877c0b4153ed8f942023-06-02T09:22:12ZengUniversitas Kristen MaranathaJurnal Teknik Sipil1411-93312549-72192022-04-0118116618410.28932/jts.v18i1.45924214PREDICTION OF ROAD CLEARANCEBartholomeus0Humisar Pasaribu1Universitas HKBP NommensenUniversitas HKBP NommensenOne method of handling soil that can be done to speed up the consolidation process is to add a Pre-Loading embankment on top of the plan embankment. In addition, this handling is also carried out to achieve a reduction by the design load, so that the settlement of embankment after the construction period still meets the required criteria and standards. This study was conducted to obtain a comparison of the prediction of embankment settlement with the empirical method using CPT data and the prediction of settlement using the Asaoka Method. In addition, the results of the consolidation coefficient will also be compared which can be used to determine the right time for Pre-Loading excavation during the construction period. The data used are CPT test data in the field as well as laboratory test data and measurement data for the settlement plate settlement closest to the position of the CPT test. From the analysis carried out, it is obtained that the prediction of decline using the Asaoka method is smaller than the prediction of decline using the empirical method using CPT data. In addition, from the analysis, it was found that at locations HB-04 and SP 70, as well as HB-07 and SP 91, showed laboratory consolidation coefficient values (cv-Lab.) which were close to the consolidation coefficients of the Asaoka Method (cv-Asa.), while in HB -05 and SP 79 and HB-06 and SP 85 show a large difference in values. The average comparison of the cv-Lab. consolidation coefficients and CV-Asa. is 58.5%.https://journal.maranatha.edu/index.php/jts/article/view/4592cptconsolidationasaoka methodpre-loadingsettlement plate
spellingShingle Bartholomeus
Humisar Pasaribu
PREDICTION OF ROAD CLEARANCE
Jurnal Teknik Sipil
cpt
consolidation
asaoka method
pre-loading
settlement plate
title PREDICTION OF ROAD CLEARANCE
title_full PREDICTION OF ROAD CLEARANCE
title_fullStr PREDICTION OF ROAD CLEARANCE
title_full_unstemmed PREDICTION OF ROAD CLEARANCE
title_short PREDICTION OF ROAD CLEARANCE
title_sort prediction of road clearance
topic cpt
consolidation
asaoka method
pre-loading
settlement plate
url https://journal.maranatha.edu/index.php/jts/article/view/4592
work_keys_str_mv AT bartholomeus predictionofroadclearance
AT humisarpasaribu predictionofroadclearance