Designing a model for the cost-optimal decommissioning and refurbishment investment decision for gas networks: Application on a real test bed in Austria until 2050
The primary goal of this paper is to investigate the most cost-effective decommissioning and refurbishment investment decision for existing gas networks. An optimization model is developed and tested on a real test bed in an Austrian federal state. The analysis is performed from the network operator...
Main Authors: | Sebastian Zwickl-Bernhard, Antonia Golab, Theresia Perger, Hans Auer |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-09-01
|
Series: | Energy Strategy Reviews |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2211467X23000883 |
Similar Items
-
Development of a Robot for Decontamination of High Places and Decommissioning Work That Can Cope with Slopes and Steps
by: Shuichiro Ogake, et al.
Published: (2023-05-01) -
Guideline for the Decommissioning/Abandonment of Subsea Pipelines
by: Ahmed Reda, et al.
Published: (2023-12-01) -
The planning strategy of robotics technology for nuclear decommissioning in Taiwan
by: Chung Yi Tu, et al.
Published: (2024-01-01) -
Pathways to Carbon-Free Transport in Germany until 2050
by: Till Gnann, et al.
Published: (2022-07-01) -
A brief investigation of the dose field virtual simulation tools for reactor decommissioning and preliminary design for the HWRR reactor in China
by: Yaping Guo, et al.
Published: (2024-01-01)