Corrosion as a cause of the failure of the pipeline steel supporting structure

The article describes the failure of the steel supporting structure of the pipeline caused by corrosion. The structure in question is a three-span steel bridge with truss girders. The structure was erected in the 1960s and is located above the railway track. Due to the specific shape of the hinges,...

Full description

Bibliographic Details
Main Authors: Paczkowski Wiesław, Skibicki Szymon
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2019/33/matecconf_icsf2019_09006.pdf

Similar Items