Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use Case

With the goal of reducing greenhouse gas emissions, the logistics sector is increasingly coming into focus. While increasing electrification is taking place in the road transport sector, the numbers in heavy-goods transport have so far been vanishingly small. Payload limitations, high investment cos...

Full description

Bibliographic Details
Main Authors: Lukas Netzer, David Wöss, Thomas Märzinger, Werner Müller, Tobias Pröll
Format: Article
Language:English
Published: MDPI AG 2022-09-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/15/19/7102
_version_ 1797479505755897856
author Lukas Netzer
David Wöss
Thomas Märzinger
Werner Müller
Tobias Pröll
author_facet Lukas Netzer
David Wöss
Thomas Märzinger
Werner Müller
Tobias Pröll
author_sort Lukas Netzer
collection DOAJ
description With the goal of reducing greenhouse gas emissions, the logistics sector is increasingly coming into focus. While increasing electrification is taking place in the road transport sector, the numbers in heavy-goods transport have so far been vanishingly small. Payload limitations, high investment costs, and charging times make it difficult for logistics companies to think about a conversion. An e-highway on Austria’s highways could provide an approach to counter these problems. Based on route data of an entire truck fleet in the construction logistics sector and by creating a model with Openrouteservice and MATLAB, calculations are carried out to show the savings potential of required battery capacities and charging infrastructure. The results show a high potential for reducing battery capacities and the required charging infrastructure at the locations approached. The results show high reduction potential, keeping the average required capacities in all scenarios below 350 kWh. Having a higher-powered e-highway of 150 kW nets slightly better results, but a major effect can still be achieved with a power of 60 kW. The cost reduction potential related to batteries and charging stations is up to 65% for individual scenarios. Thus, the result of this work primarily aims at presenting the advantages of a potential e-highway for logistics companies operating on Austria’s roads but can also be considered from the regulatory side when it comes to incentivizing sustainable logistics solutions from the political side.
first_indexed 2024-03-09T21:47:04Z
format Article
id doaj.art-2bc0885439ca499c883357b726fde401
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-09T21:47:04Z
publishDate 2022-09-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-2bc0885439ca499c883357b726fde4012023-11-23T20:13:12ZengMDPI AGEnergies1996-10732022-09-011519710210.3390/en15197102Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use CaseLukas Netzer0David Wöss1Thomas Märzinger2Werner Müller3Tobias Pröll4Institute of Chemical and Energy Engineering, University of Natural Resources and Life Sciences, Peter-Jordan-Straße 82, 1190 Vienna, AustriaInstitute of Chemical and Energy Engineering, University of Natural Resources and Life Sciences, Peter-Jordan-Straße 82, 1190 Vienna, AustriaInstitute of Chemical and Energy Engineering, University of Natural Resources and Life Sciences, Peter-Jordan-Straße 82, 1190 Vienna, AustriaInstitute of Chemical and Energy Engineering, University of Natural Resources and Life Sciences, Peter-Jordan-Straße 82, 1190 Vienna, AustriaInstitute of Chemical and Energy Engineering, University of Natural Resources and Life Sciences, Peter-Jordan-Straße 82, 1190 Vienna, AustriaWith the goal of reducing greenhouse gas emissions, the logistics sector is increasingly coming into focus. While increasing electrification is taking place in the road transport sector, the numbers in heavy-goods transport have so far been vanishingly small. Payload limitations, high investment costs, and charging times make it difficult for logistics companies to think about a conversion. An e-highway on Austria’s highways could provide an approach to counter these problems. Based on route data of an entire truck fleet in the construction logistics sector and by creating a model with Openrouteservice and MATLAB, calculations are carried out to show the savings potential of required battery capacities and charging infrastructure. The results show a high potential for reducing battery capacities and the required charging infrastructure at the locations approached. The results show high reduction potential, keeping the average required capacities in all scenarios below 350 kWh. Having a higher-powered e-highway of 150 kW nets slightly better results, but a major effect can still be achieved with a power of 60 kW. The cost reduction potential related to batteries and charging stations is up to 65% for individual scenarios. Thus, the result of this work primarily aims at presenting the advantages of a potential e-highway for logistics companies operating on Austria’s roads but can also be considered from the regulatory side when it comes to incentivizing sustainable logistics solutions from the political side.https://www.mdpi.com/1996-1073/15/19/7102e-highwaysustainable logisticsbatterytransporte-trucks
spellingShingle Lukas Netzer
David Wöss
Thomas Märzinger
Werner Müller
Tobias Pröll
Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use Case
Energies
e-highway
sustainable logistics
battery
transport
e-trucks
title Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use Case
title_full Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use Case
title_fullStr Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use Case
title_full_unstemmed Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use Case
title_short Impact of an E-Highway on the Required Battery Capacities and Charging Infrastructure for Cargo Transport with E-Trucks on the Basis of a Real Use Case
title_sort impact of an e highway on the required battery capacities and charging infrastructure for cargo transport with e trucks on the basis of a real use case
topic e-highway
sustainable logistics
battery
transport
e-trucks
url https://www.mdpi.com/1996-1073/15/19/7102
work_keys_str_mv AT lukasnetzer impactofanehighwayontherequiredbatterycapacitiesandcharginginfrastructureforcargotransportwithetrucksonthebasisofarealusecase
AT davidwoss impactofanehighwayontherequiredbatterycapacitiesandcharginginfrastructureforcargotransportwithetrucksonthebasisofarealusecase
AT thomasmarzinger impactofanehighwayontherequiredbatterycapacitiesandcharginginfrastructureforcargotransportwithetrucksonthebasisofarealusecase
AT wernermuller impactofanehighwayontherequiredbatterycapacitiesandcharginginfrastructureforcargotransportwithetrucksonthebasisofarealusecase
AT tobiasproll impactofanehighwayontherequiredbatterycapacitiesandcharginginfrastructureforcargotransportwithetrucksonthebasisofarealusecase