Feasible Time for Extraction of Lead from Spent Paste by Pyrometallurgical Process
This paper focuses on determining the feasible time for production of lead from spent paste (SP) by pyrometallurgical process through the rotary furnace. The extraction process faces several problems due to difficulties to control reaction media conditions. The experiments had been done on rotary fu...
Main Author: | Fakhri H. Ibraheem |
---|---|
Format: | Article |
Language: | English |
Published: |
Koya University
2018-12-01
|
Series: | ARO-The Scientific Journal of Koya University |
Subjects: | |
Online Access: | http://aro.koyauniversity.org/article/view/375 |
Similar Items
-
Positive synergistic effect of the reuse and the treatment of hazardous waste on pyrometallurgical process of lead recovery from waste lead-acid batteries
by: Marija Štulović, et al.
Published: (2014-09-01) -
Blood lead levels in children living close to the antimony and lead mining-milling-smelting complex in Serbia
by: Matić Branislava I., et al.
Published: (2018-01-01) -
Ultra‐Fast Recyclable and Value‐Added Desulfation Method for Spent Lead Paste via Dual Intensification Processes
by: Lulu Chai, et al.
Published: (2023-12-01) -
The obtained of concentrates containing precious metals for pyrometallurgical processing
by: B. Oleksiak, et al.
Published: (2014-10-01) -
Extraction of Sodium Tungstate from Tungsten Ore by Pyrometallurgical Smelting
by: Liqiang Xu, et al.
Published: (2023-02-01)