Modeling of transient states in the start-up path during voltage and start-up power application
During a blackout, after the post-disaster collapse of an electric power system (EPS), units of thermal power plants should switch-over to the house load operation mode (PPW). However, regarding the dynamics of a post-disaster blackout process, many units can be in forced outage Therefore, restart o...
Main Authors: | Ireneusz Grządzielski, Bartosz Olejnik, Mikołaj Zakrzewski |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2019-12-01
|
Series: | Archives of Electrical Engineering |
Subjects: | |
Online Access: | https://journals.pan.pl/Content/114121/PDF/04_AEE-2019-4_INTERNET.pdf |
Similar Items
-
Start-up of a power unit of a thermal power plant auxiliary system with supply from a hydropower plant
by: Zbigniew Lubośny, et al.
Published: (2013-09-01) -
A Novel Modeling for Assessing Frequency Behavior During a Hydro-to-Thermal Plant Black Start Restoration Test
by: Roberto Benato, et al.
Published: (2019-01-01) -
Propagation-Based Network Partitioning Strategies for Parallel Power System Restoration With Variable Renewable Generation Resources
by: Yazhou Jiang, et al.
Published: (2021-01-01) -
An Analysis of Power System Stability against Hyperchaotic Noises and Blackouts
by: Hakan Öztürk
Published: (2021-11-01) -
Start-up scheme for converter station of MMC-HVDC based on single-clamp sub-module using in grid black start
by: ChaoLiang Wang, et al.
Published: (2018-10-01)