Two Scenario-Based Heuristics for Stochastic Shift Design Problem with Task-Based Demand
In this paper, we propose a deterministic shift design model with task-based demand and give the corresponding stochastic version with a probability constraint such that the shift plan designed is staffed with the workforce with a certain probability of performing all given tasks. Since we currently...
Main Authors: | Zhiying Wu, Qingxin Chen, Ning Mao, Guoning Xu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-09-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/13/18/10070 |
Similar Items
-
Analyzing Meta-Heuristic Algorithms for Task Scheduling in a Fog-Based IoT Application
by: Dadmehr Rahbari
Published: (2022-10-01) -
Wireless edge device intelligent task offloading in mobile edge computing using hyper-heuristics
by: B. Vijayaram, et al.
Published: (2022-12-01) -
An Intelligent Hybrid Heuristic Scheme for Smart Metering based Demand Side Management in Smart Homes
by: Awais Manzoor, et al.
Published: (2017-08-01) -
A heuristic-based task scheduling algorithm for scientific workflows in heterogeneous cloud computing platforms
by: Reza NoorianTalouki, et al.
Published: (2022-09-01) -
Sequential Tasks Shifting for Participation in Demand Response Programs
by: Mahsa Khorram, et al.
Published: (2020-09-01)