Crusher to Mill Transportation Time Calculation—The Aitik Case

Comminution is a major contributor to the production costs in a mining operation. Therefore, process optimization in comminution can significantly improve cost efficiency. The mine-to-mill concept can be utilized to optimize the comminution chain from blasting to grinding. In order to evaluate the m...

Full description

Bibliographic Details
Main Authors: Balázs Varannai, Daniel Johansson, Håkan Schunnesson
Format: Article
Language:English
Published: MDPI AG 2022-01-01
Series:Minerals
Subjects:
Online Access:https://www.mdpi.com/2075-163X/12/2/147
_version_ 1797477776552361984
author Balázs Varannai
Daniel Johansson
Håkan Schunnesson
author_facet Balázs Varannai
Daniel Johansson
Håkan Schunnesson
author_sort Balázs Varannai
collection DOAJ
description Comminution is a major contributor to the production costs in a mining operation. Therefore, process optimization in comminution can significantly improve cost efficiency. The mine-to-mill concept can be utilized to optimize the comminution chain from blasting to grinding. In order to evaluate the mill performance of the ore from a specific location of the deposit, a direct link needs to be established between the mill performance and the place of origin in the mine. Today, technology enables the accurate positioning of drilling, loading, and dumping points in the mine, making the ore flow between loading and crushing more transparent. However, the material flow from the crusher to the mill is not yet fully understood and monitored. This paper presents the development of an ore transportation model, based on the virtual silo concept, between the crusher and the mill for Boliden’s Aitik mine in northern Sweden. The proposed model helps to establish a link between in situ ore location and mill performance. Two transportation time calculations are used, one based on mass balance, and one based on momentary values. Historical data are used to test the capabilities of the model and the results are compared with the transportation time calculated from the mean capacity values, commonly used in previous studies to connect mill parameters with in situ ore location. The comparison of the results show that the mean parameter-based values can be as much as 50% lower than the transportation times, even in normal operation. In the tested times, the transportation time based on momentary values systematically underestimated the cumulated times. The developed model will also serve as a starting point to analyze the effect of geotechnical parameters, in addition to drill and blast design, on the mill performance of the blasted ore.
first_indexed 2024-03-09T21:22:31Z
format Article
id doaj.art-2ebdf154aa544754812946a06e698294
institution Directory Open Access Journal
issn 2075-163X
language English
last_indexed 2024-03-09T21:22:31Z
publishDate 2022-01-01
publisher MDPI AG
record_format Article
series Minerals
spelling doaj.art-2ebdf154aa544754812946a06e6982942023-11-23T21:17:35ZengMDPI AGMinerals2075-163X2022-01-0112214710.3390/min12020147Crusher to Mill Transportation Time Calculation—The Aitik CaseBalázs Varannai0Daniel Johansson1Håkan Schunnesson2Division of Mining and Rock Engineering, Luleå University of Technology, SE-97187 Luleå, SwedenDivision of Mining and Rock Engineering, Luleå University of Technology, SE-97187 Luleå, SwedenDivision of Mining and Rock Engineering, Luleå University of Technology, SE-97187 Luleå, SwedenComminution is a major contributor to the production costs in a mining operation. Therefore, process optimization in comminution can significantly improve cost efficiency. The mine-to-mill concept can be utilized to optimize the comminution chain from blasting to grinding. In order to evaluate the mill performance of the ore from a specific location of the deposit, a direct link needs to be established between the mill performance and the place of origin in the mine. Today, technology enables the accurate positioning of drilling, loading, and dumping points in the mine, making the ore flow between loading and crushing more transparent. However, the material flow from the crusher to the mill is not yet fully understood and monitored. This paper presents the development of an ore transportation model, based on the virtual silo concept, between the crusher and the mill for Boliden’s Aitik mine in northern Sweden. The proposed model helps to establish a link between in situ ore location and mill performance. Two transportation time calculations are used, one based on mass balance, and one based on momentary values. Historical data are used to test the capabilities of the model and the results are compared with the transportation time calculated from the mean capacity values, commonly used in previous studies to connect mill parameters with in situ ore location. The comparison of the results show that the mean parameter-based values can be as much as 50% lower than the transportation times, even in normal operation. In the tested times, the transportation time based on momentary values systematically underestimated the cumulated times. The developed model will also serve as a starting point to analyze the effect of geotechnical parameters, in addition to drill and blast design, on the mill performance of the blasted ore.https://www.mdpi.com/2075-163X/12/2/147ore transportvirtual silomine-to-millAitik mine
spellingShingle Balázs Varannai
Daniel Johansson
Håkan Schunnesson
Crusher to Mill Transportation Time Calculation—The Aitik Case
Minerals
ore transport
virtual silo
mine-to-mill
Aitik mine
title Crusher to Mill Transportation Time Calculation—The Aitik Case
title_full Crusher to Mill Transportation Time Calculation—The Aitik Case
title_fullStr Crusher to Mill Transportation Time Calculation—The Aitik Case
title_full_unstemmed Crusher to Mill Transportation Time Calculation—The Aitik Case
title_short Crusher to Mill Transportation Time Calculation—The Aitik Case
title_sort crusher to mill transportation time calculation the aitik case
topic ore transport
virtual silo
mine-to-mill
Aitik mine
url https://www.mdpi.com/2075-163X/12/2/147
work_keys_str_mv AT balazsvarannai crushertomilltransportationtimecalculationtheaitikcase
AT danieljohansson crushertomilltransportationtimecalculationtheaitikcase
AT hakanschunnesson crushertomilltransportationtimecalculationtheaitikcase